A steel bar construction management method based on a BIM technology

A technology for construction management and reinforcement, applied in image data processing, electrical digital data processing, special data processing applications, etc., can solve the problems of non-reuse of surplus materials, no on-site construction guidance, waste of materials, etc., and reduce the number of reinforcement bars , improve binding efficiency and quality, reduce the effect of loss rate

Pending Publication Date: 2019-05-07
WUHAN YIYE CONSTR ENG
View PDF6 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] At present, there are very few reinforcement construction management methods based on BIM technology. These methods only manage the reinforcement information, blanking, processing, resampling and calculation, and carry out information management and control on the bill of materials and other processes, but for the remaining materials There is no reuse, no guidance on on-site construction, and waste of materials

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A steel bar construction management method based on a BIM technology
  • A steel bar construction management method based on a BIM technology
  • A steel bar construction management method based on a BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0022] A BIM technology-based reinforcement construction management method, including steps:

[0023] S1. Set up a BIM cloud platform through the server, and establish a three-dimensional digital steel bar model on the modeling end (such as figure 1 ), enter the name, location, size, material and steel bar information of the component, and after self-inspection and mutual inspection to ensure correctness (to prevent systematic errors), optimize the reinforcement arrangement so that the reinforcement arrangement meets the design and construction requirements and In accordance with the specifications, the optimized steel bar model is uploaded to the BIM cloud platform.

[0024] S2. On-site management personnel visit the BIM cloud platform to inquire about the steel bar model and information in each area, make technical disclosures to the on-site construc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a steel bar construction management method based on a BIM technology. The steel bar construction management method includes: Erecting BIM cloud platform, establishing a steel bar model and inputting information; inquirying steel bar models and information of all areas; generating a steel bar blanking table of a single component or a specified area through the steel bar model; machining the steel bars according to the discharging table, generating a remaining material statistical table before machining, then matching and combining the next discharging table and the remaining material statistical table, naming, numbering and pasting the remaining materials to the steel bars, storing all the matched remaining materials independently, utilizing the remaining materialswhen the next steel bar is machined, exporting a steel bar framework diagram, and carrying out construction according to the framework diagram. According to the method, the sample overturning accuracy is ensured, the efficiency is improved, the material loss rate is reduced, and the binding efficiency and quality are improved.

Description

technical field [0001] The invention belongs to the field of construction, and in particular relates to a method for managing steel bar construction based on BIM technology. Background technique [0002] In the field of construction, most of the steel bar management is too extensive, and the blanking table is often obtained by manually flipping samples based on experience. There is no exact theory as a guarantee, the waste of materials is large, and the remaining steel bar is not fully utilized. The use of matching is extremely low. [0003] BIM technology is a new technology in the construction industry. Based on the three-dimensional model of building information, it has the characteristics of visualization, simulation, and optimization. It is also more and more applied to the entire life cycle of buildings. The industry has a big technological upgrade. [0004] At present, there are very few reinforcement construction management methods based on BIM technology. These me...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06T17/00
Inventor 梅俊高宓谈玮马恒力李少祥廖红玉
Owner WUHAN YIYE CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products