Optimal dispatching method and system of distributed photovoltaic cluster
A distributed photovoltaic and optimal dispatching technology, applied in photovoltaic power generation, reactive power adjustment/elimination/compensation, load forecasting in AC networks, etc., can solve problems such as high operating cost, poor control effect, and large line loss
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0109] Embodiment 1 of the present invention provides a distributed photovoltaic cluster optimal scheduling method, the specific flow chart is as follows figure 1 As shown, the specific process is as follows:
[0110] S101: The master station calculates the pre-built optimal scheduling model, obtains the short-time scale optimal scheduling result, and sends it to the sub-stations;
[0111] S102: The sub-station receives the short-time-scale optimal scheduling result issued by the master station, and distributes the short-time-scale optimal scheduling result to each photovoltaic field station in the distributed photovoltaic cluster;
[0112] S103: The photovoltaic field station receives the distribution result of the sub-station, and calculates the distribution result combined with each photovoltaic unit in the photovoltaic field station to obtain a short-time scale scheduling instruction;
[0113] S104: The photovoltaic unit executes the short-time-scale scheduling instructio...
Embodiment 2
[0205] Embodiment 2 of the present invention provides a distributed photovoltaic cluster optimization dispatching system, including a master station, a substation, and a photovoltaic field station; the functions of the three are described in detail below:
[0206] The master station is used to calculate the pre-built optimal scheduling model, obtain the short-time scale optimal scheduling result, and issue it to the sub-stations;
[0207] The sub-station is used to receive the short-time-scale optimal scheduling results issued by the main station, and distribute the short-time-scale optimal scheduling results to each photovoltaic field station in the distributed photovoltaic cluster;
[0208] The photovoltaic field station is used to receive the distribution results of the sub-stations, and combine the distribution results with each photovoltaic unit in the photovoltaic field station for calculation to obtain short-time-scale scheduling instructions, and the photovoltaic units ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com