Construction process for bridge crack repairing in building construction
A technology for crack repair and building construction, applied in the field of technology, can solve problems such as easy falling off, crack exposure, bridge safety hazards, etc., and achieve the effect of simple operation steps, tight adhesion, and guaranteed service life and safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0012] The construction technology when bridge cracks are repaired in building construction includes the following steps:
[0013] (1) Cut the carbon fiber cloth according to the size required by the design. Before construction, the surface moisture content of the concrete at the paste site and the ambient temperature should be measured. If the concrete surface moisture content is >4% or the ambient temperature is <5°C, measures should be taken. Construct after meeting the requirements;
[0014] (2) Remove the loose parts on the surface of the reinforced member until the concrete structure layer is exposed. If there are cracks, they should be repaired first, and then repaired with repair materials, and the thickness of the concrete protective layer should not be less than 15mm. If it is solid, impurities such as laitance layer and oil stain should also be removed, and it should be polished until the new aggregate surface is exposed, and the flatness should reach 5mm / m; the cor...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com