Overflow confluence diversion and self-breaking dam earthwork plate and extraordinary flood diversion channel
A dyke and flooding technology, applied in the field of dam water diversion and conservancy projects, can solve problems such as lack of availability, high requirements for flood season management and explosives management, and out-of-control flood diversion.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035]Example 1: Watershed flood diversion system, the embankment of a certain river basin adopts the super flood channel of the geotechnical slab of the overflow and confluence diversion self-collapsing embankment, and the overflow and confluence diversion and flushing self-collapsing dam 1 is designed according to the flood prevention and mitigation design theory of the flood confluence diversion self-collapsing embankment. Standard flood dam disaster prevention and reduction theory design geoslab very flood channel 2, overflow confluence diversion self-break dam 1 bottom connects geoslab very flood channel 2, geoslab very flood channel 2 both sides connect embankment bank 3; super standard flood dam protection The theory of disaster reduction, which is to determine the structural form and scale of the special flood channel of the geotechnical board according to the flood damage mechanism of flood discharge and beach fields and the goal of disaster prevention and reduction, an...
Embodiment 2
[0054] Embodiment 2, the extreme flood diversion of war water attack and the extraordinary flood diversion of rivers crossing the border rivers between countries: 1) prevent war water attack, adopt the method of decentralized flood diversion and decentralized water storage, and use self-breaking dams and extraordinary spillways of geosynthetic materials for emergency response To deal with war water attack; to deal with the dam break and surge disaster caused by the water attack of the upstream reservoir, it is now built at the auxiliary dam of the reservoir and the low dam on the bank to prevent or reduce the dam break disaster; at the head of the canal The dikes or barrages on both sides of the project are built to prevent the dam break surge from destroying the canal head project; the upstream flood diversion gates of the rivers are built to prevent the dam break surge from destroying the flood diversion gates and diverting; the dikes on both sides of the river are scattered t...
Embodiment 3
[0055]Example 3, example of flood diversion and protection dams: A small cross-border river does not have the conditions to build a flood detention area. Building a flood diversion gate is not only expensive, but it is also difficult to manage far away from villages. Concentrating on flooding one place is unfairly opposed. In view of this situation, the present invention is adopted to distribute floods in a balanced manner to the beach fields, the low-standard flood floods are diverted using a fixed-period rotation system, and an automatic forecasting system is set at the flood diversions. Due to the low cost of the present invention, unmanned management, automatic and controllable flood diversion is economically and technically feasible; because of its fair flood diversion, residents and farmers can accept and solve the difficult problem of flood protection embankment site selection and management problems in non-flood detention areas; because there are definite Flood diversi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com