Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for advanced compaction grouting reinforcement of spongy stratum suitable for shallow-buried excavation tunnel

A technology of weak stratum, shallow burial and underground excavation, used in tunnels, tunnel linings, underground chambers, etc., can solve the problems of insignificant growth of stratum mechanical properties and impermeability, low effective slurry retention rate, and difficult to guarantee reinforcement effect. , to solve the difficulty of slurry diffusion control, improve the effective utilization rate, and ensure the effect of grouting reinforcement

Active Publication Date: 2019-01-08
CHINA UNIV OF PETROLEUM (EAST CHINA)
View PDF5 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the above methods all have the following disadvantages: ① It is difficult to control the grout diffusion. Since the grout diffuses mainly in the form of splitting in the formation, the grout diffusion radius is generally much larger than the target grouting reinforcement range, the effective retention rate of the grout is low, and the grout is seriously wasted; ② The reinforcement effect is difficult to guarantee. Due to the low resistance to grout splitting and diffusion, the grouting pressure is low (generally <1MPa), the compaction degree of the formation under the grouting pressure is low, and the mechanical properties and impermeability of the formation do not increase. significantly

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for advanced compaction grouting reinforcement of spongy stratum suitable for shallow-buried excavation tunnel
  • Method for advanced compaction grouting reinforcement of spongy stratum suitable for shallow-buried excavation tunnel
  • Method for advanced compaction grouting reinforcement of spongy stratum suitable for shallow-buried excavation tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] It should be pointed out that the following detailed description is exemplary and intended to provide further explanation to the present application. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.

[0039] It should be noted that the terminology used here is only for describing specific implementations, and is not intended to limit the exemplary implementations according to the present application. As used herein, unless the context clearly dictates otherwise, the singular is intended to include the plural, and it should also be understood that when the terms "comprising" and / or "comprising" are used in this specification, they mean There are features, steps, operations, means, components and / or combinations thereof;

[0040] As introduced in the background technology, the grouting methods commonly used in the shallow underground...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for advanced compaction grouting reinforcement of a spongy stratum suitable for a shallow-buried excavation tunnel. The method comprises the following steps that: a stratum compaction performance of penetration of a tunnel into a spongy stratum is tested by the experiment and thus compaction degrees of the stratum under different grouting pressures as well as mechanical and anti-penetrability performances corresponding to different compaction degrees are determined; influences on tunnel excavation stability by the different stratum compaction degrees and grouting reinforcement ring thicknesses are analyzed, so that a target grouting pressure and a grouting reinforcement ring thickness are determined; a maximum expansion radius of an expansive soil geotextile bag and an earth surface grouting hole arrangement interval are determined; a grouting pipe with the expansive soil geotextile bag is made; grouting hole drilling work is carried out on the earth surface and the grouting pipe with the expansive soil geotextile bag is inserted after the grouting holes reache a predetermined depth; grouting is carried out by using a quick-setting grouting materialand grouting is stopped when the grouting pressure reaches the target grouting pressure; the gaps between the grouting pipe and the grouting holes are filled and sealed; and grouting work of all grouting holes is completed.

Description

technical field [0001] The invention relates to the field of tunnel construction, in particular to an advanced compaction and grouting reinforcement method for weak strata suitable for shallow-buried underground excavation tunnels Background technique [0002] Urban subway tunnels are generally shallow-buried tunnels. During the construction of subway tunnels, they often pass through loose and weak strata of the Quaternary system, such as water-rich sandy soil layers and soft clay layers. In the process of tunnel excavation, it is very easy to induce engineering accidents such as tunnel collapse, which seriously threatens the safety of tunnel excavation. Grouting is an effective means of strengthening loose and weak strata. This method strengthens the loose and weak stratum in front of the tunnel face by grouting in advance to improve the mechanical properties and impermeability of the stratum, thereby ensuring the tunnel excavation process. surrounding rock stability. The...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/10
Inventor 张连震张庆松刘人太黄长鑫李志鹏韩伟伟杨文东楚云添薄纯杰
Owner CHINA UNIV OF PETROLEUM (EAST CHINA)
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products