Municipal construction temporary concrete steel structure bridge and mounting method thereof
A steel structure and concrete technology, applied in bridges, bridge forms, bridge construction, etc., can solve problems such as congestion, long construction period, pedestrians and non-motor vehicles mixed with motor vehicles, and achieve the effect of ensuring tightness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The invention discloses a temporary concrete steel structure bridge for municipal construction, referring to figure 1 , including the bottom surface 3 located at the ground floor, the bottom surface 3 is the original ground floor road surface, and also includes several prefabricated road slabs 1, steel structure skeletons 2 are arranged on both sides below the road slab 1, and the steel structures on both sides A passageway 4 for pedestrians and vehicles is formed between the skeletons 2, and the adjacent road slabs 1 are connected end to end, and a fastening device is provided between the adjacent road slabs 1 to fix the two road slabs 1, so that A plurality of road slabs 1 are tightly connected and fixed to form a road surface for vehicles above the bottom surface 3 .
[0040] refer to figure 1 , in order to enhance the supporting effect of the whole structure, the steel structure skeleton 2 is hollow, after the road slab 1 is installed and fixed, fill the steel skelet...
Embodiment 2
[0047] The invention also discloses a method for installing a temporary concrete-steel structure bridge for municipal construction, the steps of which include:
[0048] S1: Fix the PTFE sliding plate 31 on the bottom surface 3, and implant the anchoring steel bar 32 on the bottom surface 3;
[0049] S2: Complete the prefabrication of the road slab 1 in the prefabrication factory, and transport it to the construction site;
[0050] S3: Install the socket 22 and the socket 23 of the adjacent road slab 1 correspondingly, and pass the steel rope into the prestressed through hole 25, and symmetrically set the two ends of each steel rope on both sides of the road slab 1 through the center jack;
[0051] S4: After every 3-4 sections of road slab 1 are installed, the entire row of through-hole jacks exert force at the same time to tension the steel rope and tighten the newly installed road slab 1;
[0052] S5: after the installation of the road slabs 1 is completed, the filler 21 ma...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com