A Construction Method of Loose Accumulation Body and Large Inclined Rock Face Foundation on Steep Slope

A technology of loose accumulation and foundation construction, which is applied in the direction of foundation structure engineering, filling, excavation, etc., can solve the problems of large grouting volume, long grouting period, and high comprehensive cost, so as to save construction site space and shift costs , The effect of reducing the cost of the shift

Active Publication Date: 2020-01-10
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP 1ST ENG
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The method of erecting steel platforms is usually adopted after clearing loose accumulations first, but this method is difficult to construct due to site constraints under steep slope conditions, and it is difficult to accurately locate and lay steel pipe pile foundations and steel casings in the case of large inclined rock faces. Income, the comprehensive cost is also very high
If the construction method of excavating the platform after grouting with steel pipes is used to stabilize the loose accumulation, the grouting volume will be large, the grouting period will be long, and the grouting effect will be difficult to control. At the same time, the load of the loose accumulation will be increased, which will increase the adverse risks. , it is also more difficult to excavate after grouting

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Construction Method of Loose Accumulation Body and Large Inclined Rock Face Foundation on Steep Slope
  • A Construction Method of Loose Accumulation Body and Large Inclined Rock Face Foundation on Steep Slope
  • A Construction Method of Loose Accumulation Body and Large Inclined Rock Face Foundation on Steep Slope

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The specific implementation manner of the present invention will be described below with reference to the accompanying drawings. Such as Figure 1 to Figure 7 Shown: a kind of foundation construction method of steep slope loose accumulative body large inclined rock surface, comprises the following steps carried out in order:

[0029] a. First excavate and clear the loose accumulation body 1 within the scope of the bridge foundation construction site, and at the same time continue to excavate the large inclined rock face 2 to a place 2-3 meters above the cap bottom elevation 4, and set up a buffer platform 3. The buffer platform 3 can not only reduce the risk that the upper loose accumulation body 1 slides down and impact the bridge foundation construction site, but also can reduce the total volume of removal, and can also be used as the gantry crane 9 track foundation for bridge foundation construction. Continue to excavate the part higher than the level 4 of the botto...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a large inclined rock surface foundation of a loose accumulation body of a steep slope. The construction method is characterized by comprising the following steps in sequence that firstly, the loose accumulation body in the range of a bridge foundation construction site is excavated and removed, and meanwhile, a buffer platform is arranged; the part, higher than the bearing platform bottom elevation and in the range of a bearing platform, of the large inclined rock surface is excavated to the bearing platform bottom elevation; the part, lower than the bearing platform bottom elevation and in the range of the bearing platform, of the large inclined rock surface is excavated into steps; a retaining wall is constructed to the bearing platform bottom elevation on the slope foot position of the loose accumulation body of the steep slope, backfilling is carried out on the excavated steps in a layered mode, and a pile foundation steel casing issimultaneously arranged in a buried mode; and filling is continuously carried out until the elevation of the buffer platform is reached to form a construction platform, a gantry crane and a drillingrig are installed, the bridge foundation construction is carried out, wherein the bridge foundation construction includes the construction of a pile foundation, after the pile foundation constructionis completed, excavation is carried out to the bearing platform bottom elevation, a pile head is removed, and finally construction of the bearing platform is carried out.

Description

technical field [0001] The invention relates to the technical field of bridge foundation construction, in particular to a method for constructing a steep slope loose accumulation body with a large inclined rock face foundation. Background technique [0002] my country's infrastructure construction is booming, and it is known as the "infrastructure madman". In particular, bridge engineering has made brilliant achievements, and it can build "tall, large, difficult, refined, sharp, and special" bridges under various complex conditions. Some bridges spanning large rivers are sometimes chosen to be built in the unfavorable environment of steep slopes with loose accumulations and large inclined rock faces due to limited conditions. To carry out bridge foundation construction under such conditions, it is first necessary to deal with loose accumulations and provide a bridge foundation construction platform. The method of erecting steel platforms is usually adopted after clearing lo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D17/04E02D17/18
CPCE02D17/04E02D17/18
Inventor 彭志川张广涛王学民张文军李福友徐恩科王文东刘新起
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP 1ST ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products