A combined control and flooding process of jelly and intralayer gas
A process method and jelly technology, which are applied in earth-moving drilling, wellbore/well components, and production fluids, etc., can solve the problems of weak plugging strength, poor stability of the control and flooding system, and only adaptability of the control and flooding system. Cost saving, simple equipment effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment
[0046] Put the pre-optimized polymer, cross-linking agent, and stabilizer suitable for well W, and put the mixed solution at the optimized concentration in the 10m 3 In liquid storage tank A7, the aging time is 2h, which is different from 10m 3 The liquid storage tank B12 is used alternately for injection, one liquid storage tank is equipped with solution and matured, and the other liquid storage tank is injected. Through the injection pump B17, it is pumped into the water injection pipeline 18 and enters the wellbore 19.
[0047] Put gas agent A, gas agent B, catalyst C and catalyst D, which are optimized in advance and are suitable for the intralayer gas generation system of well W, into the mixed solution of gas gas agent A and gas gas agent B at the optimized concentration first for 5 m 3 In the liquid storage tank 1, stir for 30 minutes through the agitator A2 and inject 10m through the injection pump A5 3 Liquid storage tank A7 or 10m 3 In the liquid storage tank B12,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com