A technology of engineering design and management methods, applied in the field of management, can solve problems such as the increase in investment of additional review resources exceeding the income, and the inability of investment units to increase the intensity of review as planned, so as to achieve the effect of reducing design changes

Inactive Publication Date: 2018-07-27
GRID POWER PLANNING & RES CENT OF GUANGDONG GRID POWER CO LTD +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If the value in the game is adjusted, the investment of additional review resources will exceed the increase in income, and the investment unit will not be able to increase the intensity of review as planned
Therefore, it is not feasible to simply modify the values ​​in the game, and the existing game system needs major improvement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Management method for power grid engineering design company
  • Management method for power grid engineering design company
  • Management method for power grid engineering design company

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0034] Such as figure 1 As shown, a power grid engineering design unit management method includes the following steps:

[0035] S1: The investment unit invites bids for the first time;

[0036] S2: The winning design unit accepts and completes the project;

[0037] S3: The investment unit evaluates the project and the design unit to judge whether the project is qualified;

[0038] S4: According to the conclusion of whether the project is qualified, deal with the design unit.

[0039] The above steps constitute the main process of power grid project bidding and project development, and also constitute the first game in the repeated game. The evaluation standard of step S3 is determined according to the standards of the investment unit, but at least includes the calculation of the balance rate to ensure that the design of the design unit is effective, and the design unit has indeed adopted a practical plan in the design stage.

[0040] When the project is recognized as quali...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention puts forward a management method for a power grid engineering design company. Bid invitation, project implementation and review are analyzed in a game playing way, a new repeated game playing mode is put forward, and a design company which wins a bid for the first time is listed in a whitelist or a blacklist which represents a credit degree according to the qualification degree of the project. If the design company is listed into a credible whitelist, the design company is proved to own intelligence and abilities, and a second project can be qualifiedly finished by a bigger probability. The respective payment and earnings and the respective priority selection of an investment company and the design company in multiple times of game playing can be analyzed in a repeated game playing mode. In game playing statistics, a new design fee index value adopts a standard deviation method and is free from the influence of individual projects, and mean value index offset is avoided.By use of the management method for the power grid engineering design company, cooperation enthusiasm and credibility among companies can be improved, and investment companies can favorably managementand supervise the work of the design company for a long term through the design fee index value.

Description

technical field [0001] The present invention relates to the field of management methods, and more specifically, to a management method for power grid engineering design units. Background technique [0002] According to statistics, the design phase affects more than 70% of the project investment. On the one hand, the economics of the design scheme affects the construction cost of the project; on the other hand, the closer the design scheme is to reality, the fewer project changes during the construction process and the less project balance. , the more it helps to control the cost of project construction and make rational use of investment. [0003] At present, the management of power grid infrastructure engineering design units includes: In terms of project access, open bidding for design units is adopted. The bidding mainly evaluates the professional level of design units based on qualification levels. For example, some power grid projects require design units to Grade A qu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q10/06G06Q30/08G06Q50/06
CPCG06Q10/0637G06Q10/101G06Q10/103G06Q30/08G06Q50/06
Inventor 高晓彬陈铭刘刚刚胡晋岚侯凯
Owner GRID POWER PLANNING & RES CENT OF GUANGDONG GRID POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products