Seepage eliminating system for lowering tailing pond dam body seepage line by using mining barren rocks and construction method thereof
A technology for mining waste rocks and tailings ponds, applied in the field of seepage drainage systems, can solve the problems of large vertical sandbag wells, frequent fluctuations in the soaking line, and endangering the safety of the dam body, so as to be beneficial to environmental protection and improve the ability to resist liquefaction , The effect of accelerating drainage consolidation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] Such as figure 1 As shown, a seepage drainage system that uses mining waste rocks to reduce the wetting line of the dam body of the tailings pond provided by Embodiment 1 of the present invention includes: a waste rock column 100 arranged inside the dam body along the direction of the central axis of the dam; The horizontal seepage drainage blind ditch 200 arranged on the tailing sand deposition beach inside the dam body and the vertical seepage drainage pipe 300 arranged inside the dam body perpendicular to the direction of the central axis of the dam; Both are connected with the bottom of the waste stone column 100; the vertical seepage drainage pipe 300 is vertically intersected with the horizontal seepage drainage blind ditch 200; figure 2 As shown), the diameter d of the waste rock column is greater than or equal to the width d1 of the initial dam crest of the tailings pond, and the height of the waste rock column is not lower than the highest water level in the d...
Embodiment 2
[0053] Figure 5 It shows the steps of a seepage drainage construction method using mining waste rocks to reduce the wetting line of the tailings pond dam body provided by Embodiment 2 of the present invention, including: Step S1: According to the geological survey report and the foundation design data of the tailings pond, obtain Tailings dam basic information;
[0054] Wherein, the tailings dam basic information includes at least the width of the initial dam crest of the tailings pond, the direction of the central axis of the dam, the highest water level in the dam, and the height of the tailings dam;
[0055] Step S2: use mining waste rocks in the dam body to build waste stone pillars along the central axis of the dam;
[0056] Among them, the waste rock column includes skeleton, geotextile and mining waste rock arranged from outside to inside, the diameter of the waste rock column is greater than or equal to the width of the initial dam crest of the tailings pond, and the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com