Post-lifting reinforcement construction method for asphalt concrete pavement inspection well
A construction method and inspection well technology, applied in roads, roads, artificial islands, etc., can solve problems such as structural layer disturbances, achieve the effects of reducing collision noise, reducing maintenance costs, and improving driving comfort
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0030] A construction method for asphalt concrete pavement inspection well back-up reinforcement, comprising the steps of:
[0031] S1. Before asphalt paving on asphalt concrete pavement, count and mark inspection wells.
[0032] S2, such as figure 2 As shown, after asphalt paving on the asphalt concrete pavement, take the center of the manhole cover 5 as the center point, and take the diameter and length of the manhole cover 5 as the radius of the inscribed circle of the regular hexagon to make a regular hexagonal stakeout.
[0033] S3. First cut the side line of the regular hexagon (by cutting machine), and then chisel the asphalt and concrete within the regular hexagon to a certain depth (by pneumatic pick or electric pick).
[0034] In this embodiment, the chiseling depth is 30 cm below the road surface elevation.
[0035] In this embodiment, th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com