Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A kind of underground structure and construction method of tunnel cover bridge passing through bad geological conditions

An underground structure and tunnel technology, applied in the field of underground underground rivers, karst caves and weak foundation tunnel engineering, can solve the problems of poor surrounding rock stability, large settlement of weak strata, etc. Reasonable effect

Active Publication Date: 2019-04-05
甘肃智广地质工程勘察设计有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide an underground structure and construction method for crossing bad geological tunnels and bridges to solve the problems of tunnels crossing karst caves, underground rivers, inverted arch uplifts, poor stability of surrounding rocks, and large settlements in weak strata.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of underground structure and construction method of tunnel cover bridge passing through bad geological conditions
  • A kind of underground structure and construction method of tunnel cover bridge passing through bad geological conditions
  • A kind of underground structure and construction method of tunnel cover bridge passing through bad geological conditions

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021]The technical principle used in the present invention: (1) Support principle: the lower end of the first type of support pile is driven into the stable soil layer, connected with the steel pipe arch frame through a different diameter connector, and the pressure of the steel skeleton is put into the first type of support pile Concrete is injected, ground beams are connected to vertical first-type support piles, and segments are nested on the upper surface of steel pipe arches to form a primary lining system; the bridge structure is composed of box girder inverted arches, cover beams, and second-type support piles; The lining system and the casing bridge structure are connected as a whole through the box girder invert and the reserved steel bars of the ground beams on both sides. This combined structure has high rigidity and good integrity, and can effectively bear and transmit surrounding rock pressure and release hydrostatic pressure. ; (2) Bridge spanning principle: This...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

An unfavorable geological body crossing tunnel casing bridge underground structure and a construction method thereof belong to the field of tunnel engineering. The unfavorable geological body crossingtunnel casing bridge underground structure comprises a primary lining system, a casing bridge structure and a second lining. The construction method comprises that pipe pieces are embedded onto steeltube arches through grooves, the steel tube arches are connected with first-type support piles through diameter-variable connectors, grade beams are poured on the connecting parts of the first-type support piles, the diameter-variable connectors and the steel tube arch to form the primary lining system; second-type support piles are between the grade beams on both sides of an excavated section, capping beams are poured at the tops of the second-type support piles, a layer of rubber cushion is laid on the capping piles, box girder inverted arches are hoisted onto the rubber cushion to form a casing bridge structure; the primary lining system and the casing bridge structure are connected in a poured mode through the box girder inverted arches and prefabricated reinforcing bars of the gradebeams on both sides; the second lining is poured to form the unfavorable geological body crossing tunnel bridge casing underground structure. The unfavorable geological body crossing tunnel bridge casing underground structure and construction method thereof can cross unfavorable geological bodies such as karst caves, underground rivers and soft ground, and meanwhile, can effectively transfer surrounding rock pressure, reduce deformation of tunnels and ensure construction safety.

Description

technical field [0001] The invention belongs to the technical field of tunnel engineering and is suitable for karst caves, underground rivers and weak foundation tunnel projects in karst areas. Background technique [0002] China's karst landforms are widely distributed and have many types, which are rare in the world. With the vigorous development of railways and highways, it is inevitable to build tunnels in karst areas. According to research, my country is building and will continue to build a large number of railway tunnels and road tunnels in karst areas. During the construction of tunnels in karst areas, it is inevitable to encounter geological disasters such as suspended underground caverns (that is, karst caves), underground rivers, and weak strata. Especially when tunnels pass through rich water-filled karst caves, such tunnels often It is weak and broken, and the geological conditions are extremely poor, which brings great harm to the construction and operation of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/00E21D11/08E21D11/10
CPCE21D11/003E21D11/08E21D11/10
Inventor 董建华王艳军骆世斌寇海军颉永斌孙国栋包万飞张明礼李忠
Owner 甘肃智广地质工程勘察设计有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products