Executive plan generation method for big data analysis process
A technology of execution plan and big data, applied in the field of big data, it can solve the problems of high technical threshold and low analysis efficiency, and achieve the effect of improving efficiency, eliminating cumbersomeness and reducing requirements.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] figure 1 A schematic diagram of a method for generating an execution plan of a big data analysis process according to an embodiment of the present invention, as shown in figure 1 As shown, the present invention provides a method for generating an execution plan of a big data analysis process, including:
[0049] Step S10, if it is determined that the task instance corresponding to the analysis task has not been executed and the task instance has dependent tasks, traverse the dependent task sequence, and execute the dependent task in the dependent task sequence;
[0050] Step S20, after the dependent task in the dependent task sequence is executed, if it is determined that the execution of the task instance is completed, a task result file is generated.
[0051] Further, the method also includes:
[0052]Judging whether the execution of the task instance is completed according to the execution status identifier of the task instance, the execution status identifier incl...
Embodiment 2
[0111] Figure 4 It is a schematic diagram of an execution plan generation device for a big data analysis process according to an embodiment of the present invention, as shown in Figure 4 As shown, the embodiment of the present invention provides an execution plan generation device for a big data analysis process, which is used to complete the methods described in the above embodiments. The device includes an execution module 10 and a generation module 20, wherein,
[0112] The execution module 10 is configured to traverse the dependent task sequence and execute the dependent task in the dependent task sequence if it is determined that the task instance corresponding to the analysis task has not been executed and the task instance has a dependent task;
[0113] The generating module 20 is configured to generate a task result file if it is determined that the execution of the task instance is completed after the dependent task in the dependent task sequence is executed.
[0...
Embodiment 3
[0126] Figure 5 A schematic structural diagram of an electronic device for generating an execution plan of a big data analysis process provided by an embodiment of the present invention, such as Figure 5 As shown, the device includes: a processor (processor) 801, a memory (memory) 802 and a bus 803;
[0127] Wherein, the processor 801 and the memory 802 complete mutual communication through the bus 803;
[0128] The processor 801 is used to call the program instructions in the memory 802 to execute the methods provided by the above method embodiments, including, for example:
[0129] If it is determined that the execution of the task instance corresponding to the analysis task has not been completed and the task instance has a dependent task, traverse the dependent task sequence, and execute the dependent task in the dependent task sequence;
[0130] After the dependent task in the dependent task sequence is executed, if it is determined that the execution of the task inst...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com