High and steep slope reinforcing and greening device and method
A technology for high and steep slopes and greening devices, applied in the fields of botanical equipment and methods, excavation, planting substrates, etc., can solve the problems of poor water retention in collapse, easy to be washed by heavy rain, secondary landslides, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0101] see Figure 1 to Figure 3 , this embodiment discloses a high and steep slope reinforcement greening device, including: reinforced three-dimensional polypropylene mesh pad 3, U-shaped nail 4, anchor rod 5, vegetation seeds, soil improvement fiber mixture 6, anti-erosion fiber mixture 7 , fiber filter pipe 8 and wedge 9; reinforced three-dimensional polypropylene mesh pad 3 is fixedly arranged on the slope surface of high and steep slope through anchor rod 5 and U-shaped nail 4, forming a first-class high and steep slope reinforcement greening device; fiber filter 8 pipes are fixed on the surface of the first-level high-steep slope reinforcement greening device through wedges 9 to form a second-level high-steep slope reinforcement greening device; the mixture of vegetation seeds and soil improvement fiber mixture 6 is arranged on the second-level high-steep slope reinforcement greening device The surface of the three-level high and steep slope reinforcement greening devic...
Embodiment 2
[0103] see Figure 1 to Figure 3 , this embodiment discloses a high and steep slope reinforcement greening device, including: reinforced three-dimensional polypropylene mesh pad 3, U-shaped nail 4, anchor rod 5, vegetation seeds, soil improvement fiber mixture 6, anti-erosion fiber mixture 7 , fiber filter pipe 8 and wedge 9; reinforced three-dimensional polypropylene mesh pad 3 is fixedly arranged on the slope surface of high and steep slope through anchor rod 5 and U-shaped nail 4, forming a first-class high and steep slope reinforcement greening device; fiber filter 8 pipes are fixed on the surface of the first-level high-steep slope reinforcement greening device through wedges 9 to form a second-level high-steep slope reinforcement greening device; the mixture of vegetation seeds and soil improvement fiber mixture 6 is arranged on the second-level high-steep slope reinforcement greening device The surface of the three-level high and steep slope reinforcement greening devic...
Embodiment 3
[0128] Embodiment 3 of the present invention also discloses a high and steep slope reinforcement greening method, comprising the following steps:
[0129] S201: Prepare reinforced three-dimensional polypropylene mat 3, soil improvement fiber mixture 6, anti-erosion fiber mixture 7 and fiber filter tube 8;
[0130] S202: the reinforced three-dimensional polypropylene mesh pad 3 is fixedly arranged on the slope surface of the high and steep slope through the anchor rod 5 and the U-shaped nail 4, forming a first-class high and steep slope reinforcement greening device;
[0131] S203: Fix the fiber filter pipe 8 on the surface of the first-level high and steep slope reinforcement and greening device through the wedge 9 to form a second-level high and steep slope reinforcement and greening device;
[0132] S204: spraying the mixture of vegetation seeds and soil improvement fiber mixture 6 on the surface of the second-level high and steep slope reinforcement greening device to form ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com