Construction site data pushing method based on BIM model, construction site data management method based on BIM model and construction site data management system based on BIM model

A technology of construction site and management system, applied in the field of computer information, can solve the problem of difficult BIM model, achieve the effect of efficient management, easy data update, project management level and management efficiency

Inactive Publication Date: 2017-12-29
JIAXING HENGCHUANG ELECTRIC POWER DESIGN & RES INST CO LTD +1
View PDF7 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Aiming at the problem that the BIM model is difficult to match with the construction site management in actual use, the first purpose of the present invention is to propose a method for pushing construction site data based on the BIM model, and to use the data advantages of the BIM model and the flexible management and carrying advantages of the mobile terminal to improve site management. The efficiency of management; the second purpose is to provide a construction site data management method based on the BIM model, and to realize the function extension of the BIM management system at the construction site by combining the mobile terminal with the BIM management system; the third purpose is to provide a method based on BIM model construction site data management system to improve project management level and management efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction site data pushing method based on BIM model, construction site data management method based on BIM model and construction site data management system based on BIM model
  • Construction site data pushing method based on BIM model, construction site data management method based on BIM model and construction site data management system based on BIM model
  • Construction site data pushing method based on BIM model, construction site data management method based on BIM model and construction site data management system based on BIM model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0070] The present invention will be further described in detail below with reference to the examples and figures, but the embodiments of the present invention are not limited thereto.

[0071] In order to make the technical solution of the present invention easier to understand and implement, in the present invention, unless otherwise specified, the mobile terminal 200 in the technical solution of the present invention refers to mobile phones and tablet computers with wireless data communication functions and human-computer interaction functions , laptop, MP4 / 5 in one of them.

[0072] The BIM information model data in the present invention should be understood as one type of data for the purpose of simplifying the discussion, and does not specifically refer to the BIM information model data in practical applications.

[0073] figure 1 Shown is a main flow chart of a BIM model-based construction site data push method in the technical solution of the present invention. Based...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction site data pushing method, a construction site data management method and a construction site data management system. The construction site data pushing method comprises steps of establishing a connection between a mobile end and the system end of a BIM management system; enabling the system end to send BIM information model data to the mobile end according to the geographical location information of the mobile end; and enabling the mobile end to feed back construction site data to achieve a purpose of improving construction site management efficiency. The construction site data management method comprises steps of establishing a connection between the mobile end and the system end of the BIM management system; enabling the mobile end to send instruction information or mobile end port information to the system end and to acquire and send construction site progress information; and enabling the mobile end to simulate a construction progress based on the BIM information model data, to calculate a deviation between the construction progress and a construction plan. By utilizing the convenience of the mobile end, the data application of the BIM management system can be extended to the construction site. By using the mobile end, a user can freely compare the actual situation at the construction site, consult the BIM information model data, and achieve efficient management of the construction site.

Description

technical field [0001] The present invention relates to the field of computer information technology, more specifically, it relates to a BIM model-based construction site data push, management method and management system. Background technique [0002] Building Information Modeling (Building Information Modeling) is based on the relevant information data of the construction project as the basis of the model to establish the building model, and simulate the real information of the building through digital information simulation. It has eight characteristics of information completeness, information relevance, information consistency, visualization, coordination, simulation, optimization and graphing. The BIM information model is applicable to all stages of engineering construction. It is applied to different fields of the project life cycle and is the core of the BIM information construction management system (hereinafter referred to as the BIM management system). [0003] Wi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08G06F17/30G06F17/50
CPCG06F16/29G06F16/51G06F16/5866G06F16/9537G06F30/13G06Q10/06313G06Q10/06395G06Q10/067G06Q10/103G06Q50/08
Inventor 徐伟明陈鼎仇群辉陆恩灏朱少华沙磊何平宋同徐杰倪瑞君沈毓章思亮李斌靳雅超陈兵强
Owner JIAXING HENGCHUANG ELECTRIC POWER DESIGN & RES INST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products