Gas-bearing coal seams U-shaped well drilling and exploiting method

A coal-measure gas, U-shaped technology, applied in the direction of mining fluid, earthwork drilling, wellbore/well components, etc., can solve the difficulty of coal-measure gas drilling construction, coal-measure gas multi-layer co-production, single target layer To achieve the effect of increasing the affected area and venting area of ​​mining, reducing the number of drilling wells in the region and the total cost of drilling, and reducing damage

Pending Publication Date: 2017-10-13
贵州省地质矿产勘查开发局一一五地质大队 +1
View PDF3 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to solve the above technical problems, the present invention provides a coal-measure gas U-shaped well drilling and development method. The coal-measure gas U-shaped well drilling and development method adopts non-target storage layer horizontal well drilling, avoiding the coal-measure gas U-shaped well drilling and development method. The collapse and pollution of wells drilled in layers, and then through fracturing to communicate with multi-layer coalbed methane, tight sandstone gas and shale gas in coal-measure gas, and cooperate with vertical wells for drainage and gas production, which solves the difficulty of coal-measure gas drilling construction Large, single target layer, and multi-layer co-production of coal-measure gas

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Gas-bearing coal seams U-shaped well drilling and exploiting method
  • Gas-bearing coal seams U-shaped well drilling and exploiting method
  • Gas-bearing coal seams U-shaped well drilling and exploiting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] Such as figure 1 and figure 2 As shown, a U-shaped well drilling and development method for coal-measure gas comprises the following steps:

[0034] ① Drill the vertical well 4 in the U-shaped well and complete the cave 9: pass through the target reservoir, drill the vertical well 4 in the U-shaped well, and complete the cave 9 at the bottom of the wellbore of the vertical well 4, and the cave 9 is located in the non-target reservoir; The target reservoirs are tight sandstone gas layer 5, shale gas layer 6, coalbed methane layer No. 27 and coalbed methane layer No. 18;

[0035] ②Drilling the vertical well section 1 of the horizontal well: through the target reservoir, drill the vertical well section 1 of the horizontal well;

[0036] ③Drilling the horizontal section 2 of the horizontal well: building deflection in the selected non-target reservoir and drilling the horizontal section 2 of the horizontal well. When drilling, the horizontal section 2 of the horizontal w...

Embodiment 2

[0039] Such as figure 1 and image 3 As shown, a U-shaped well drilling and development method for coal-measure gas comprises the following steps:

[0040] ① Drill the vertical well 4 in the U-shaped well and complete the cave 9: pass through the target reservoir, drill the vertical well 4 in the U-shaped well, and complete the cave 9 at the bottom of the wellbore of the vertical well 4, and the cave 9 is located in the non-target reservoir; The target reservoirs are tight sandstone gas layer 5, shale gas layer 6, coalbed methane layer No. 27 and coalbed methane layer No. 18;

[0041] ②Drilling the vertical well section 1 of the horizontal well: through the target reservoir, drill the vertical well section 1 of the horizontal well;

[0042] ③Drilling the horizontal section 2 of the horizontal well: building deflection in the selected non-target reservoir and drilling the horizontal section 2 of the horizontal well. When drilling, the horizontal section 2 of the horizontal we...

Embodiment 3

[0045] Such as figure 1 and Figure 4 As shown, a U-shaped well drilling and development method for coal-measure gas comprises the following steps:

[0046] ①Drill the vertical well 4 in the U-shaped well and complete the cave 9: pass through the target reservoir, drill the vertical well 4 in the U-shaped well, and complete the cave 9 at the bottom of the wellbore of the vertical well 4, and the cave 9 is located in the non-target reservoir; The target reservoirs are tight sandstone gas layer 5, shale gas layer 6, coalbed methane layer No. 27 and coalbed methane layer No. 18;

[0047] ②Drilling the vertical well section 1 of the horizontal well: through the target reservoir, drill the vertical well section 1 of the horizontal well;

[0048] ③Drilling the horizontal section 2 of the horizontal well: build up the deflection in the selected non-target reservoir and drill the horizontal section 2 of the horizontal well. When drilling, the horizontal section 2 of the horizontal w...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a gas-bearing coal seams U-shaped well drilling and exploiting method, and the method comprises the steps of (1) drilling the straight well of the U-shaped well and conducting cavern completion; (2) drilling the straight well segment of the horizontal well; (3) drilling the horizontal segment of the horizontal well; and (4) perforating and fracturing the horizontal well so as to communicate a multilayer object layer of the gas-bearing coal seams. According to the invention, a non-target reservoir is deflected and the horizontal segment is drilled, like a sandstone or a limestone; a borehole is prevented from collapsing, block is prevented from falling off and the well is prevented from leaking when a target reservoir of gas-bearing coal seams is drilled; drilling efficiency is raised; drilling fluid is prevented from soaking the reservoir of the gas-bearing coal seams for a long time, particularly the coalbed gas layer and the shale gas layer; damage of particles in solid phase and drilling cuttings in the drilling fluid to the reservoir of the gas-bearing coal seams is effectively reduced; by communication between the horizontal segment of U-shaped well and the reservoir of the gas-bearing coal seams by pressing crack in a large scope, exploitation swept area and deflation area are increased; multilayer commingled production of the gas-bearing coal seams is realized; the utilization rate of the gas-bearing coal seams is raised; area well drilling quantity and total cost of well drilling are reduced; and the yield of a single well, exploitation degree and economic benefit are greatly increased.

Description

technical field [0001] The invention relates to the field of coal bed gas exploitation, in particular to a method for drilling and developing U-shaped wells of coal measure gas. Background technique [0002] Due to the advancement of engineering technologies such as drilling and fracturing, coal-measure gas has shown great development value and potential as an unconventional natural gas. However, in coal-measure gas, the thickness of coal seams varies greatly and the number of layers is large, and the shale gas, tight gas and coalbed methane developed between layers have the characteristics of continuous accumulation and coexistence in the area, which cannot meet the conditions of mechanical stratified fracturing, and it is difficult to separate them. Moreover, the economic benefits of independent development of coal-measure gas are not obvious. The "Thirteenth Five-Year Plan" proposes the combined exploitation of coalbed methane, shale gas and tight sandstone gas. The dev...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21B43/14E21B43/26E21B43/30
CPCE21B43/006E21B43/14E21B43/26E21B43/305
Inventor 张佳宋继伟杜胜江陈厚国
Owner 贵州省地质矿产勘查开发局一一五地质大队
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products