Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Multi-agent-based job-shop multi-objective collaborative optimization scheduling method

A multi-objective optimization, multi-agent technology, applied in the field of multi-agent-based workshop multi-objective collaborative optimization and scheduling, can solve a single completion time, a single agent has no global view optimization interval, and the overall scheduling performance of the optimization interval system is limited, etc. question

Active Publication Date: 2017-09-01
NANJING UNIV OF AERONAUTICS & ASTRONAUTICS +1
View PDF7 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the traditional multi-agent method for solving the Job-Shop Problem (JSP) has the following problems: (1) The traditional multi-agent method for solving the job-shop dynamic scheduling problem generally takes a single completion time as the optimization goal , in the actual scheduling, not only the time index, but also the production index such as energy consumption and cost should be considered comprehensively. Multi-objectiveness is a basic attribute of the workshop scheduling problem. (2) When the traditional multi-agent method solves the job shop scheduling problem, it often introduces the bidding mechanism in the market as a negotiation strategy between agents, thus causing a single agent to behave as much as possible. It is possible to complete the task goals set by itself while ignoring the collaborative optimization relationship between each other's tasks, which is reflected in the "selfishness" and "selfishness" of a single agent, and there is no "overall view"; (3) traditional multi-intelligence The agent method realizes the task allocation and optimization between agents through the bidding mechanism. However, the task optimization allocation between agents under this mechanism is essentially a single-step, local optimization, and the optimization interval is too small, which leads to the overall scheduling of the system. Performance improvements are very limited
All in all, the current multi-agent method for solving the workshop scheduling problem has the problems of single optimization goal, no global view of a single agent, and too small optimization interval, which causes a gap between theoretical research and practical application

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-agent-based job-shop multi-objective collaborative optimization scheduling method
  • Multi-agent-based job-shop multi-objective collaborative optimization scheduling method
  • Multi-agent-based job-shop multi-objective collaborative optimization scheduling method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] The present invention will be further described below in conjunction with drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, but not to limit the present invention. In addition, it should be noted that, for the convenience of description, only some parts related to the present invention are shown in the accompanying drawings but not the whole content. Unless otherwise defined, all technical and scientific terms used herein are related to the technical field of the present invention. The skilled person generally understands the same meaning. The terms used herein are for describing specific embodiments only, and are not intended to limit the present invention.

[0067] Please refer to figure 1 as shown, figure 1 It is a flow chart of the multi-agent-based multi-objective collaborative optimization scheduling method for workshops provided by the embodiment of the present inventi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a multi-agent-based job-shop multi-objective collaborative optimization scheduling method, which comprises the following steps: a multi-agent-based production workshop scheduling model is established; a workpiece agent proposes a job scheduling request to a planning agent according to a processing task of itself; the planning agent inserts a time cycle window, and carries out multi-objective optimization scheduling based on time, load, cost and energy consumption on a plurality of job scheduling requests received in the window; and the planning agent releases a scheduling result to a device agent, and the device agent finishes the processing task and informs the workpiece agent to release a next process. By inserting the time window, arranging the planning agent and packaging a multi-objective optimization algorithm, optimization range is expanded, overall scheduling performance of the system is improved, multi-objective optimization scheduling is realized, and the defects of single-step optimization and single-objective optimization of a conventional multi-agent method are solved.

Description

technical field [0001] The invention relates to the technical field of workshop scheduling control, in particular to a multi-agent-based multi-objective collaborative optimization scheduling method for a workshop. Background technique [0002] As the core technology of advanced manufacturing technology and modern management technology, effective workshop scheduling is a necessary measure to solve the diversification of orders and complex information in today's manufacturing environment. Therefore, how to establish a distributed, open, and efficient intelligent scheduling method, in It is especially necessary in today's manufacturing environment. The development of Multi-Agent System (MAS) provides an effective solution to the above problems. However, the traditional multi-agent method for solving the Job-Shop Problem (JSP) has the following problems: (1) The traditional multi-agent method for solving the job-shop dynamic scheduling problem generally takes a single completio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/04
CPCG06Q10/04G06Q10/06312G06Q50/04Y02P90/30
Inventor 唐敦兵魏鑫张泽群郑杜张涛
Owner NANJING UNIV OF AERONAUTICS & ASTRONAUTICS
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products