Seepage-proofing method for deep cover layer
A technology of deep overburden and overburden, applied in water conservancy projects, sea area engineering, infrastructure engineering, etc., can solve the problems of increased project investment and little necessity of seepage flow monitoring, and achieve short construction period, convenient construction, and anti-corrosion Visible effect of seepage effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] An anti-seepage method for deep overburden, the method comprising:
[0021] 1) Divide rock formations and determine seepage parameters; carry out in-situ tests on surface rock formations, and carry out indoor seepage deformation tests of upper covering layers on deep rock formations to determine the permeability characteristics of covering layers;
[0022] 2) Construction shall be carried out with seepage slope as the mainstay and seepage amount as supplementary;
[0023] 3) The arrangement of the cutoff wall adopts the form of short connecting plate + cutoff wall for anti-seepage. If the foundation rock group is distributed in rhyme bands and there is an impermeable layer with a thickness greater than 5m and a permeability coefficient of 1*10-5cm / s, it will be used as a suspension The backing layer of anti-seepage wall.
[0024] 4) Use sheet piles and concrete anti-seepage walls that withstand large hydraulic gradients as hanging curtains, and prepare anti-filtration ...
Embodiment 2
[0026] An anti-seepage method for deep overburden, the method comprising:
[0027] 1) Divide rock formations and determine seepage parameters; carry out in-situ tests on surface rock formations, and carry out indoor seepage deformation tests of upper covering layers on deep rock formations to determine the permeability characteristics of covering layers;
[0028] 2) Construction is carried out with seepage slope as the mainstay and infiltration amount as the supplement. During the construction, the safety of seepage slope and concrete indirect contact erosion is emphasized. The contact surface between the bottom of the dam and the foundation adopts the vertical anti-seepage form; the vertical anti-seepage forms include: If the depth of the anti-seepage wall is greater than 40m, the thickness of the anti-seepage wall is greater than 1m, and the anti-seepage wall is embedded in the bedrock by 1m to 4m, the slot method is adopted; if the covering layer contains blocks with a maxim...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Permeability coefficient | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com