Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Overhauling arrangement structure for permanent plug of high arch dam diversion tunnel

A technology for arranging structures and diversion tunnels, which is applied in water conservancy projects, sea area engineering, coastline protection, etc., can solve the problems of high maintenance costs, cumbersome, and difficult opening gates, and achieve simple and reliable layout structures, safe and reliable structures, and safety sex high effect

Active Publication Date: 2017-07-21
POWERCHINA CHENGDU ENG
View PDF9 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] (1) The outlet of the diversion tunnel is equipped with a shore tower lock chamber, which has a large project scale, high investment and high maintenance costs;
[0005] (2) The sluice chamber at the outlet of the diversion tunnel has been deposited by sediment for many years (this has happened in existing projects), so it is difficult to open the sluice, and the sluice has been placed underwater for a long time, which may cause damage and leakage;
[0006] (3) The diversion tunnel construction branch tunnel channel is often connected with the drainage corridor channel of the water cushion pond. In order to avoid the influence of the diversion tunnel plug or the water seepage of the diversion tunnel lining, ensure the normal operation and safety of the water cushion pond drainage corridor , it needs to pump water regularly, which is extremely cumbersome

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Overhauling arrangement structure for permanent plug of high arch dam diversion tunnel
  • Overhauling arrangement structure for permanent plug of high arch dam diversion tunnel
  • Overhauling arrangement structure for permanent plug of high arch dam diversion tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0026] like Figure 1 to Figure 6 As shown, the maintenance layout structure of the permanent plug in the diversion tunnel of the high arch dam includes the diversion tunnel. The permanent plug 6 is arranged in the diversion tunnel, and the permanent plug 6 is connected with the anti-seepage curtain 5. The downstream side of the plug 2 is connected to the construction branch hole 4, and a drainable sealing structure 1 is arranged at the exit 3 of the diversion hole. The drainable sealing structure 1 includes a concrete sealing body A15, and the upstream end of the concrete sealing body A15 A corridor 11 for drainage and grouting is provided, and the roof of the corridor 11 is arranged with a drainage shaft 13 connected to the outside world, and the outer end of the drainage shaft 13 is arranged with a shaft platform 12; The maintenance and sealing stru...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an overhauling arrangement structure for a permanent plug of a high arch dam diversion channel, correspondingly relates to an overhauling method for the permanent plug of the high arch dam diversion channel and belongs to the technical field of diversion and closure construction in hydraulic and hydropower engineering. The overhauling arrangement structure includes a drainable blocking structure and an overhauling blocking structure. The drainable blocking structure is arranged at the position of an outlet of the diversion channel and includes a gallery, a vertical well platform, a draining vertical well and a water collecting well. The overhauling blocking structure is arranged in a construction adit and includes an overhauling channel and an overhauling water blocking gate. The overhauling method includes the steps that water flow in the diversion channel is completely extracted through the arranged draining vertical well, then the overhauling gate is opened through the overhauling channel so that entering the diversion channel can be achieved, and finally monitoring and overhauling of the permanent plug are achieved. According to the arrangement structure, monitoring and overhauling of the permanent plug of the diversion channel are facilitated, and the arrangement structure of safety running of a draining gallery of a plunge pool is not affected; and the structure is simple and reliable, safety is high, the investment is saved, and construction is convenient.

Description

technical field [0001] The invention relates to an inspection arrangement structure of a permanent plug in a diversion tunnel of a high arch dam, and correspondingly relates to a method for overhauling a permanent plug in a diversion tunnel of a high arch dam, belonging to the technical field of diversion and interception construction in water conservancy and hydropower projects. Background technique [0002] During the construction of high arch dams in deep mountain and canyon areas, the cofferdams are cut off throughout the year, and the diversion method of diversion tunnels is the most widely used construction diversion method. After these large diversion tunnels complete their missions, they all need It is sealed with a permanent concrete plug structure. After the plugging is completed, the permanent plug of the diversion tunnel and the anti-seepage curtain of the dam form a whole to play the role of anti-seepage of the dam body. Its level is consistent with that of the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02B8/06
CPCE02B8/06Y02E10/20
Inventor 张超黎昀冯菊
Owner POWERCHINA CHENGDU ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products