Assembled communication channel structure and its construction method
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A communication channel and assembled technology, which is applied in tunnels, shaft equipment, earthwork drilling and mining, etc.
Active Publication Date: 2019-08-27
宁波用躬科技有限公司 +2
View PDF5 Cites 1 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0003] The technical problem to be solved by the present invention is to provide an assembled communication channel structure and its construction method with controllable quality, strong integrity with the shield tunnel, and high joint waterproof performance. The pipe jacking method is used to start and the shield method is used to advance, which not only solves the problem of starting in a small space, but also makes it easier to control the construction axis of the communication channel
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment 1
[0091] The structure of the assembled communication channel of the present invention is as follows: figure 1 , figure 2 and Figure 4 As shown, it is mainly composed of the following structures: shield tunnel concrete segment 1, shield tunnel composite segment 2, segment connection system 3, communication channel steel tube segment 4 and communication channel concrete segment 5;
[0092] The shield tunnel composite segment 2 includes a composite segment steel pipe segment 21, a composite segment concrete segment 22 and a reserved reinforcement box 23, and the outer side of the composite segment steel tube segment 21 is connected to the shield tunnel concrete segment 1 through a connecting bolt 17 Assembled and connected and its inner side is integrally connected with the composite segment concrete pipe segment 22, the inner side of the composite segment concrete pipe segment 22 is connected with the steel pipe segment 4 of the communication channel through the inter-segment ...
Embodiment 2
[0099] A construction method of an assembled communication channel structure of the present invention comprises the following steps:
[0100] a , Step 1, positioning the axis 6 of the contact channel;
[0101] b , Step 2, erecting the mobile prestressed support system 7;
[0102] c , Step 3, the starting airtight cabin 9 is installed synchronously with the shield machine 8;
[0103] d , Step 4, install the sealed receiving system 10 of the shield machine;
[0104] e , Step 5, the push-type reaction frame 11 on the originating side is installed;
[0105] f , Step 6, start excavation by shield machine jacking method;
[0106] g , Step 7, grouting and plugging the gap between the steel pipe section 4 of the connecting passage on the departure side and the composite segment 2 of the shield tunnel;
[0107] h , Step 8, the tunneling construction of the shield tunneling machine with shield tunneling method;
[0108] i , Step 9, the shield machine enters the tunnel to r...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention discloses an assembling type connecting aisle structure and a construction method thereof. The assembling type connecting aisle structure is characterized by comprising a shield tunnel concrete segment, a shield tunnel composite segment, an inter-segment connecting system, a connecting aisle steel segment and a connecting aisle concrete segment. The shield tunnel composite segment comprises a composite segment steel segment section, a composite segment concrete segment section and a reserved reinforcing body box, the outer side of the composite segment steel segment section is connected with the shield tunnel concrete segment through connecting bolts in an assembling mode, the inner side of the composite segment steel segment section is integrally connected with the composite segment concrete segment section, and the inner side of the composite segment concrete segment section is connected with the connecting aisle steel segment through the inter-segment connecting system. According to the construction method, the mode of starting with a pipe jacking method and advancing with a shield method is adopted. The assembling type connecting aisle structure and the construction method thereof have the advantages the quality is controllable, the integrality with a shield tunnel is high, and joint waterproofness is high; and the starting problem of narrow and small spaces is solved, and the construction axis of a connecting aisle can also be easily controlled.
Description
technical field [0001] The invention relates to a communication channel structure and a construction method thereof, in particular to an assembled communication channel structure and a construction method thereof, belonging to the field of underground engineering. Background technique [0002] According to 19.1.22 of the "Code for Metro Design" GB50157-2003: between two single-line interval tunnels, when the continuous length of the tunnel is greater than 600m, a connecting passage should be set up. Therefore, a large number of subway tunnels are provided with communication passages between the uplink and downlink lines. At present, the communication channel is generally horseshoe-shaped, and is reinforced by the freezing method and then constructed by the mining method. However, this method has the following disadvantages: (1) Due to the constraints of the structure, it is difficult to carry out mechanical excavation, and the speed of manual excavation is slow. The quality...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.