Method for preparing warm mixing foamed asphalt
A foamed asphalt and warm mix technology is applied in the field of preparation of warm mix foamed asphalt, which can solve the problems of low road performance and difficulty, and achieve the effects of enhancing tolerance, improving pressure resistance and increasing viscosity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] A preparation method for warm-mix foam asphalt, comprising the following steps:
[0023] Step 1, in parts by weight, mix 40 parts of asphalt, 2 parts of surfactant, 2 parts of dimethylformamide, 1 part of bentonite, 2 parts of hypromellose and 30 parts of water at 50°C for 40 minutes , cooled to room temperature to obtain mixed asphalt 1;
[0024] Step 2, heating the mixed asphalt to 30°C, adding 0.3 parts of polyvinyl alcohol, 2 parts of calcium bicarbonate and 3 parts of absolute ethanol in parts by weight, stirring for 20 minutes, and standing for 5 hours to obtain modified emulsified asphalt;
[0025] Step 3, in parts by weight, mix 80 parts of asphalt, 3 parts of 2-acrylamide-2-methylpropanesulfonic acid and 1 part of ethylene glycol dimethacrylate, heat up to make the mixture in a fluid state, and keep it for 5 minutes. Then lower the temperature to 80°C, add 4 parts of glycerol, stir and mix for 5 minutes to obtain mixed asphalt II;
[0026] Step 4: Heat the mi...
Embodiment 2
[0029] A preparation method for warm-mix foam asphalt, comprising the following steps:
[0030] Step 1, in parts by weight, mix 43 parts of asphalt, 4 parts of surfactant, 3 parts of dimethylformamide, 2 parts of bentonite, 2.4 parts of hypromellose and 33 parts of water at 55°C for 35 minutes , cooled to room temperature to obtain mixed asphalt 1;
[0031] Step 2, heating the mixed asphalt to 35°C, adding 0.4 parts by weight of polyvinyl alcohol, 4 parts of calcium bicarbonate and 4 parts of absolute ethanol, stirring for 25 minutes, and standing for 6 hours to obtain modified emulsified asphalt;
[0032] Step 3, in parts by weight, take 90 parts of asphalt, 4 parts of 2-acrylamide-2-methylpropanesulfonic acid and 1.5 parts of ethylene glycol dimethacrylate and mix them, raise the temperature to make the mixture in a fluid state, and keep it for 8 minutes. Then lower the temperature to 85°C, add 6 parts of glycerol, and stir and mix for 8 minutes to obtain mixed asphalt II; ...
Embodiment 3
[0036] A preparation method for warm-mix foam asphalt, comprising the following steps:
[0037] Step 1, in parts by weight, mix 47 parts of asphalt, 4 parts of surfactant, 3 parts of dimethylformamide, 2 parts of bentonite, 2.8 parts of hypromellose and 38 parts of water at 57°C for 32 minutes , cooled to room temperature to obtain mixed asphalt 1;
[0038] Step 2, heating the mixed asphalt to 37°C, adding 0.4 parts by weight of polyvinyl alcohol, 4 parts of calcium bicarbonate and 5 parts of absolute ethanol, stirring for 27 minutes, and standing for 7 hours to obtain modified emulsified asphalt;
[0039] Step 3, in parts by weight, mix 95 parts of asphalt, 5 parts of 2-acrylamide-2-methylpropanesulfonic acid and 1.8 parts of ethylene glycol dimethacrylate, heat up to make the mixture in a fluid state, and keep it for 8 minutes. Then lower the temperature to 85°C, add 7 parts of glycerol, stir and mix for 8 minutes to obtain mixed asphalt II;
[0040] Step 4: Heat the mixed...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com