Method for rapidly determining land occupation scale of TBM (Tunnel Boring Machine) precast concrete duct piece factory
A technology for precast concrete and segment factories, which is applied in special data processing applications, instruments, electrical digital data processing, etc., and can solve problems such as affecting production efficiency and waste of resources.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0110] A tunnel project in Nyingchi, Tibet, has a total length of 4.8km. Except for the entrance section, which is constructed by conventional drilling and blasting method, the rest of the tunnel section is excavated by double-shield TBM. The diameter of the tunnel excavation section is d=8.8m. The construction period is 10 months.
[0111] Using this method to calculate the land occupation scale of the TBM precast concrete segment factory in this project mainly includes the following steps:
[0112] 1. According to the total tunnel length of 4.8km and the TBM excavation construction period of 10 months, obtain the first unknown TBM monthly average excavation footage x=480m / month involved in the present invention;
[0113] 2. According to the general situation of the project, obtain the second unknown tunnel excavation section diameter d=8.8m involved in the present invention;
[0114] 3. Substituting the two parameters of TBM monthly average excavation footage x and tunnel e...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com