[0039] Geological condition
[0040] The 1# pier cap is located in the Jinsha River below the slope of Hongge Avenue, Panzhihua City. The river bed of 1# pier is rocky soil and contains large boulders, with a layer thickness of about 14m; 2# pier is excavated about 20m from the cofferdam foundation pit on the side of the road, and the upper part is excavated to the foot of the road side slope, and the road side slope is Loose accumulation of rocks sandwiched between sand. The lower part is embedded with a weakly weathered granite layer up to 8m, and the rock layer is relatively hard, so it needs to be excavated by water blasting.
[0041] surroundings
[0042] Pier 1# is basically located on the left side of Jinsha River, below the side slope of Hongge Avenue, about 30m closer to the road. The outside of Hongge Avenue is the existing Chengdu-Kunming Railway; the road traffic is heavy. Pier 2# is located on the right side of the Jinsha River, below the side slope of the Jin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com