Project schedule tracking adjustment method and system based on PERT
A technology of project schedule and adjustment method, which is applied in the direction of instruments, data processing applications, office automation, etc., and can solve problems such as low efficiency, lack of project consideration, and poor rationality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0058] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0059] The system structure of the present invention is as figure 1 shown. The structure is divided into data input module, preprocessing module, schedule module and tracking adjustment module.
[0060] figure 2 It is an overall flow chart of the present invention, image 3 Create a flow chart of the calculation example for the schedule, as shown in the figure. The specific steps to realize the PERT schedule planning method based on the improved time parameter estimation are as follows:
[0061] 1) Estimate the construction period of each process in the network plan diagram of a certain project code number according to the most pessimistic construction period b, select the construction path with the largest total construction period as the critical path, and express the obtained critical path as 1→2→3→4→ 5. The key process flow chart is as follows...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com