Water-stop PC steel pipe pile and inner pre-stressed section steel support combined supporting construction method
A construction method and prestressing technology, applied in excavation, infrastructure engineering, construction, etc., can solve problems such as foundation pit construction trouble, environmental pollution, cement slurry pollution, etc., to solve noise and mud problems, good integrity, support Simple and convenient effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] This method has been applied in the demolition and resettlement housing project for non-residents converted from rural areas. The project has two underground floors and 26-28 floors above the ground. It adopts a frame shear wall structure. The depth of the foundation pit is about 9m. The soil quality is mainly muddy clay and clay The foundation pit enclosure adopts a PC steel pipe water stop pile and a prestressed steel internal support combined support system. The steel pipe pile 1 has a specification of 630x14, the pile length is 25m, and the internal support adopts H-shaped steel with a specification of 400x400x13x21. During the excavation, there was no cracking in the soil, and the monitoring results of the foundation pit showed that the displacement and rate of change of the soil were small, which ensured the safety and reliability of the foundation pit construction. After the foundation construction is completed, the steel pipe piles and section steel are recycled ...
Embodiment 2
[0045] This method has been applied in the project of public green space and social parking garage. The project has 1 basement floor with a total construction area of 15832m2 2 , frame shear wall structure, the excavation depth of the foundation pit is about 8m, the foundation pit enclosure is supported by steel pipe piles and a prestressed steel internal support, the steel pipe pile 1 specification is 630x14, the pile length is 22m, and the internal support adopts the specification of 400x400x13x21 The application of this method speeds up the construction progress, ensures the safety of the foundation pit, and has outstanding benefits. Construction steps are identical with embodiment 1.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com