Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Vault shear wall anti-explosion and drilling-resistant formwork erecting construction method

A construction method and shear wall technology, which are applied in the direction of formwork/formwork/work frame, formwork/formwork/work frame connector, on-site preparation of building components, etc., can solve the difficulty of formwork support and dismantling. , inconvenient transportation of materials, small working surface and other problems, to reduce the difficulty of formwork support and dismantling, ensure the construction quality, and facilitate the effect of vertical formwork and formwork dismantling

Inactive Publication Date: 2017-02-22
JIANGSU JIANGZHONG GROUP
View PDF5 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The working surface is small, and the construction formwork is difficult. Anti-riot, anti-drilling and anti-theft performance must be considered. When setting up the formwork, the use of pre-embedded plastic pipes for pull bolts cannot be considered. The overall one-time pouring makes it difficult to set up and remove the formwork
The construction site is located on the basement floor, so it is extremely inconvenient to transport materials, and it is not conducive to the entry of large machinery

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Vault shear wall anti-explosion and drilling-resistant formwork erecting construction method
  • Vault shear wall anti-explosion and drilling-resistant formwork erecting construction method
  • Vault shear wall anti-explosion and drilling-resistant formwork erecting construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0019] The construction method of explosion-proof and anti-drilling vertical formwork for the shear wall of the treasury in this embodiment, the specific steps of the construction method are as follows:

[0020] (1) Preliminary preparations: do a good job of technical disclosure, personnel and equipment preparation; at the same time, do a good job of working conditions and transportation preparations;

[0021] (2) Selected materials: 15mm thick bamboo plywood is used, the backing is 60×80 wooden corrugated, and the template is 200mm apart; the steel pipe is made of Φ48 double steel pipe; the tie rod is made of Φ14 secondary machining round steel;

[0022] (3) Formwork for the corridor wall: such as figure 1 and 2 As shown, the outer wall of the corridor adopts the water-stop pair of tie rods with formwork limit braces, and the distance between them is set to 500mm. Nuts, the left side pull bolts are 160 mm from the bottom surface, and the right side pull bolts are 250 mm fro...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a vault shear wall anti-explosion and drilling-resistant formwork erecting construction method. The construction method comprises the following steps that (1) materials are selected; (2) ambulatory wall formworks are erected; (3) ambulatory cast-in-place slab formworks are erected; and (4) the formworks are dismounted. During formwork design, fixing inner nuts are used on the inner sides, and left split bolts and right split bolts are staggered up and down. The method has the advantages that through the vault shear wall anti-explosion and drilling-resistant formwork erecting construction method, the formwork erecting and dismounting difficulty is lowered, and thus the construction quality is well ensured.

Description

technical field [0001] The invention belongs to the field of building construction, and in particular relates to an explosion-proof and anti-drilling vertical formwork construction method for a shear wall of a vault. Background technique [0002] The business office building project of Zaozhuang Bank Co., Ltd. has a total construction area of ​​about 30,000 square meters. It has a frame structure with 22 floors above ground and 1 floor underground. The eaves of the building are 99.8 meters high. , 300, and 350, according to Article 3.4.6 of the "Financial Industry Standards of the People's Republic of China-Bank Treasury" (JR / T003-2000), the wall, roof, and floor of the vault are designed to be C50 commercial concrete, and the wall standards must tend to The prevention index of the main security layer near the warehouse door has anti-theft performance such as explosion-proof and anti-drilling. The underground warehouse building is designed as a corridor with a clear width of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G11/18E04G17/065E04G17/14
CPCE04G11/18E04G17/065E04G17/14
Inventor 王国斌张跃良王友建高以兵沈杰戴建峰沈志军宋汝军沈百寿
Owner JIANGSU JIANGZHONG GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products