Shale gas horizontal well proppant in-crack shielding and temporary plugging staged fracturing process
A technology for staged fracturing and horizontal wells, which is applied in wellbore/well components, production fluid, earthwork drilling and production, etc. It can solve the problems that perforating tools cannot be lowered, reduce the risk of subsequent construction, and achieve stable and reliable perforation , the effect of low size requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0027] A staged fracturing process for shielding temporary plugging in a proppant fracture in a shale gas horizontal well, comprising the following steps:
[0028] (1) Run the coiled tubing and sandblasting perforating tools into the section that needs fracturing, and after performing multiple clusters of perforation, take out the coiled tubing and perforating tools;
[0029] (2) Set the highest safe pump pressure on the ground, carry out main fracturing, and promote volumetric fractures in the reservoir;
[0030] (3) When the injection volume reaches 1600~1800m 3 Then, pump the proppant slug for temporary plugging;
[0031] (4) When the slug for sand filling enters the formation hole, reduce the injection displacement until all the sand plugs enter the formation;
[0032] (5) If the wellbore pressure rises to more than the maximum safe pump pressure set on the ground (the pressure exceeds the normal construction pump pressure of the main fracturing by more than 15MPa), the ...
Embodiment 2
[0040] By adopting the present invention, firstly, the ground preparation work is carried out according to the construction requirements;
[0041] Run the coiled tubing with flushing head and sandblasting perforating tools to clean the wellbore and correct the depth, and perform the first cluster of sandblasting and perforating operations, and then drag the coiled tubing string to perform multiple clusters of sandblasting and perforating operations in sequence. , take out the coiled tubing when finished.
[0042] By means of casing injection, the main fracturing construction is carried out by applying the fracturing process of large displacement, large liquid volume, and slick water carrying sand, and temporary proppant plugging measures in artificial fractures are carried out at the end of the main fracturing construction to increase the concentration of the trailing proppant. , after the high-concentration proppant enters the reservoir pores, reduce the construction displace...
Embodiment 3
[0045] Well YS-1 was completed at the Longmaxi Formation in the Silurian system, and was completed with a 139.7mm oil layer casing. The well is completed at a depth of 4517m, with a maximum inclination of 93.02゜ and a vertical depth of 2561.68m. The target entry point is located at 3017m, the target exit point is located at 4517m, and the horizontal section is 1500m long. The reservoirs encountered in Well YS-1 have good physical properties, with an average effective porosity of 3.9%, an average TOC of 3.6%, and an average total gas content of 4.8m 3 / t, the reservoir brittleness index in the horizontal section is higher. The triaxial stress of the reservoir is characterized by strike-slip faults, the difference between the maximum and minimum horizontal principal stresses is large (greater than 15MPa), and the distribution of natural fractures is complex.
[0046] The well is designed to apply the 14 sections of the fracturing construction of the present invention, and the s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com