Method of Pouring Bituminous Mortar in Deep Slot Holes
A technology of asphalt mortar and slotted holes, applied in dams, buildings, barrages, etc., can solve problems such as water leakage between layers of asphalt concrete core walls, uneven technology, difficulties, etc., and achieve fast repair, reliable remedial methods, and fast methods Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0011] see figure 1 , the method for pouring asphalt mortar in the deep groove hole of the present embodiment comprises the following steps:
[0012] 1) Drill slot hole 2 on asphalt concrete core wall 1;
[0013] 2) Before pouring asphalt mortar, clean up the sundries in the slot, make the bottom of the slot and the wall of the slot clean and dry, and lower the chute 3 heated to 90°C to the bottom of the slot where the asphalt mortar is to be poured;
[0014] 3) Pouring asphalt mortar 4 upwards from the bottom of the slot hole. When pouring, first heat the part where the asphalt mortar will be poured and the area 40-50 cm above it. The heating temperature is 50°C, and then pour 150°C left and right asphalt mortar. The height of each pouring The ascent speed is 25cm / min; during pouring, there are measures for shielding rainwater to prevent rainwater from entering the pouring hole; after pouring all the slot sections, the leaky asphalt concrete core wall is quickly repaired. T...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com