Quick Repair Method for Water Leakage Deep in Asphalt Concrete Core Wall of Earth-rock Dam

An asphalt concrete and repair method technology, which is applied in water conservancy projects, marine engineering, coastline protection and other directions, can solve the problems of uneven technology of construction units, leakage between layers of asphalt concrete core walls, difficulties, etc., to solve the technical problems of rapid repair , reliable remedies, quick results

Active Publication Date: 2017-12-22
GEZHOUBA GRP NO 2 ENG
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In our country, the application of roller compacted asphalt concrete as the anti-seepage core wall in earth-rock dams is short, and the technology of construction units is uneven, while the roller compacted or poured asphalt concrete core wall is constructed layer by layer. Even every 1 meter of poor interlayer bonding will cause water leakage; especially for cast asphalt concrete core walls, due to the separation of aggregates or insufficient vibration, water leakage is very easy to occur; asphalt concrete core walls will inevitably have interlayer water leakage In some dams, the asphalt concrete core wall leakage phenomenon was discovered when the project had been completed, and such incidents had already occurred in the built dams; after the completion of the dam, it was not only very difficult to excavate the asphalt concrete core wall, but also had to be excavated at the same time. After the dam shell material is rebuilt, the repair cost is very high and time-consuming; the current solution is to make a cement concrete cut-off wall in the dam shell material, which has a long construction period, high cost and low reliability

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Quick Repair Method for Water Leakage Deep in Asphalt Concrete Core Wall of Earth-rock Dam
  • Quick Repair Method for Water Leakage Deep in Asphalt Concrete Core Wall of Earth-rock Dam

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] see figure 1 , figure 2 , the rapid repair method for water leakage deep in the asphalt concrete core wall of an earth-rock dam according to the present invention, the method is to drill a number of holes 2 on the asphalt concrete core wall 1, and the edges of each hole are connected to form the first phase I deep groove along the axis L of the core wall 3. The groove length is 5m. Pour asphalt mortar 4 upwards from the bottom of the groove in the deep groove of the first phase. Drill several holes on the asphalt concrete core wall at a distance of 3.5m from the first phase I deep groove, and the edges of each hole are connected to form a second phase I deep groove 5 with a groove length of 5m along the axis of the asphalt concrete core wall, and pour asphalt mortar . After pouring asphalt mortar in the deep grooves of the first and second phase I for 13 hours, drill several holes on the asphalt concrete core wall between the deep grooves of the first phase I and th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a quick repairing method for water leakage in a deep position of a bituminous concrete core wall of an earth and rockfill dam. A plurality of holes are drilled in the bituminous concrete core wall, the edges of the holes are mutually connected to form a first I-stage deep groove which is 4-6 m long along the axis of the core wall, and bituminous mortar is poured upwards from the bottom of the first I-stage deep groove; meanwhile, a plurality of holes are drilled in the position, 3-4 m away from the first I-stage deep groove, of the bituminous concrete core wall, the edges of the holes are mutually connected to form a second I-stage deep groove which is 4-6 m long, and bituminous mortar is poured; 10-15 hours later after the bituminous mortar is poured in the first I-stage deep groove and the second I-stage deep groove, a plurality of holes are drilled in the position, between the first I-stage deep groove and the second I-stage deep groove, of the bituminous concrete core wall, the edges of the holes are mutually connected to form a first II-stage deep groove which is 3-4 m long, at the two ends of the first II-stage deep groove, the poured bituminous mortar is cut by 40-50 mm correspondingly, and bituminous mortar is poured; and operation is circulated until all leakage points on the axis of the core wall are covered by the groove section where the bituminous mortar is poured. The quick repairing method is simple and reliable and can guarantee the waterproof effect of the concrete core wall.

Description

Technical field: [0001] The invention relates to a rapid repair method for water leakage in the deep part of the roll-compacted or poured asphalt concrete anti-seepage core wall used in earth-rock dams and tailings dams in water conservancy and hydropower projects. Background technique: [0002] The rolling and pouring asphalt concrete anti-seepage core wall structure of the earth-rock dam has the advantages of small engineering volume, fast construction speed, and no interference to the dam construction; the rolling and pouring asphalt concrete is used as the anti-seepage in the design of the earth-rock dam The core wall material has become the development direction, and at the same time, the asphalt concrete core wall earth-rock dam project has achieved greater development in the water conservancy and hydropower industries. In our country, the application of roller compacted asphalt concrete as the anti-seepage core wall in earth-rock dams is short, and the technology of c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02B3/16E02B7/02
CPCE02B3/16E02B7/02
Inventor 朱志坚孙海涛郭艳萍屈庆余
Owner GEZHOUBA GRP NO 2 ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products