Double backpressure condenser optimized operation device and operation method thereof
A technology for optimizing operation and operation methods, applied in steam/steam condensers, lighting and heating equipment, etc., and can solve problems such as increased back pressure of low back pressure side condensers, increased heat consumption rate of steam turbines, and decreased tightness. , to achieve the effect of reducing the heat consumption rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] An optimal operation device for double back pressure condensers, including a high back pressure condenser 2, a low back pressure condenser 1 and a circulating water pipeline, the circulating water pipeline is divided into a first circulating water pipeline 11 and a second circulating water pipeline 12. Both the first circulating water pipeline 11 and the second circulating water pipeline 12 flow from the low back pressure condenser 1 to the high back pressure condenser 2, which is characterized in that a first bypass is set on the first circulating water road, The first bypass is connected across the two ends of the low back pressure condenser 1, a second bypass is provided on the second circulating waterway, and the second bypass is also connected across the two ends of the low back pressure condenser 1, A second control valve 41 is arranged on the first bypass, and a second control valve 42 is arranged on the second bypass. When the unit is running and the vacuum of t...
Embodiment 2
[0047] An operation method for the above-mentioned double back pressure condenser optimal operation device, characterized in that it comprises the following steps:
[0048] Step 1. Calculation of steam turbine blocking back pressure value P z ,
[0049] P z =f(G ms )------Formula 1)
[0050] where G ms is the main steam flow rate of the steam turbine, the unit is kg / s, obtained by the DCS system of the steam turbine;
[0051] Step 2. Calculating the blocked exhaust steam temperature t of the steam turbine z , according to the turbine blocking back pressure value P calculated in step 1 z , according to the IF-97 water vapor formula, the corresponding saturated steam temperature is the steam turbine blocked exhaust temperature t z ; The main steam flow G of the steam turbine obtained by the unit DCS control system ms , calculate the corresponding blocking back pressure value according to the formula (1), and calculate the corresponding saturated steam temperature t accor...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com