Bamboo fibrous filler-based integrated sewage treatment device and method
A sewage treatment device and bamboo fiber technology, applied in the direction of aerobic and anaerobic process treatment, can solve the problems of unfavorable development and promotion of integrated equipment technology, no metering device and line integration, high manufacturing and operation and maintenance costs, and achieve The method of filling and replacement is simple, the loss of water head along the way is reduced, and the effect of fast film formation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0083] An application method of an integrated sewage treatment device based on bamboo fiber filler, the combination method is as follows figure 2 As shown, the steps are:
[0084] (1) The sewage first enters the integrated sewage treatment device as the anaerobic pool A and the anoxic pool B in turn. This process device is not aerated, the HRT of the anaerobic pool is 2h, and the HRT of the anoxic pool is 2h;
[0085](2) The pretreated sewage enters three integrated sewage treatment devices connected in parallel as an aerobic pool C, and its HRT is 6h; Body DO is in the range of 2-3mg / L;
[0086] (3) The sewage treated by the aerobic tank is directly effluent; the process returns the sludge to the anaerobic tank through the water pump and the vent pipe, and the reflux ratio is 1:1.
[0087] In this embodiment, the relevant parameters of the integrated sewage treatment device are as follows:
[0088] The diameter of the cylindrical shell is 40cm, the ratio of diameter to he...
Embodiment 2
[0100] An integrated sewage treatment device based on bamboo fiber filler and its application method, the steps are:
[0101] (1) The sewage enters the integrated sewage treatment device, and the water intake time is 0.5h;
[0102] (2) After the water intake is completed, start the blower of the integrated sewage treatment device to enter the aeration reaction stage, so that the DO of the pool body is within the range of 2-3mg / L, and the HRT of this stage is 4h;
[0103] (3) After the aeration stage is completed, the sewage is allowed to stand still in the integrated sewage treatment device for 1 hour;
[0104] (4) After the static stage is completed, it enters the drainage stage, and the time of this stage is 0.5h.
[0105] In this embodiment, only one integrated sewage treatment device is adopted in the SBR process, and the sewage treatment is carried out through the alternation of the time sequence, so as to meet the requirement of effluent reaching the standard.
[0106]...
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
diameter | aaaaa | aaaaa |
length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com