Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel

An immersed tube tunnel and construction method technology, which is applied in the direction of construction, infrastructure engineering, sheet pile walls, etc., can solve the problems of dismantling and restoring the original riverbed, high construction difficulty, complex construction environment, etc., and achieves controllable and economical construction period. Low cost and good impermeability

Inactive Publication Date: 2016-08-10
中铁隧道集团二处有限公司
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] Aiming at the problem that the reconstruction of cofferdams in the middle of the river is greatly affected by the hydrological conditions of the river, the construction environment is complex, the construction difficulty is high, and the cofferdams need to be removed and the original riverbed restored. The construction method, whose construction process is simple and controllable, facilitates the rapid reconstruction of the cofferdam and guarantees its durability

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel
  • Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The detailed construction method of the present invention is illustrated here by taking Nanchang Honggutan Ganjiang section reconstruction cofferdam construction as an example, but this can not be interpreted as the limitation to the scope of application of the present invention, the present invention also can be used for other rivers, lakeside, seaside reconstruction cofferdam construction.

[0024] figure 1 A cross-sectional view of the reconstructed cofferdam for the Ganjiang section of Honggutan, Nanchang, figure 2 The floor plan of the reconstruction of the cofferdam for the Ganjiang section of Honggutan, Nanchang. Refer below figure 1 with figure 2 Describe the construction process in detail.

[0025] (1) Weir body construction in the range of river bed to 15.0m elevation

[0026] The original sand-filled long tube bag cofferdam upstream and downstream part of the weir body was washed away, the weir body in the middle of the river was washed away, and there ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of water conservancy construction, and relates to a construction method for reconstructing a cofferdam anti-seepage system in an immersed tube tunnel. The construction method comprises the steps that remaining sand-filled long pipe bags and a river bed after an original primary cofferdam is destroyed by rush of river are adopted as a base, and stones are thrown at two sides of the base to form an inner side riprap cofferdam body and an outer side riprap cofferdam body; the space between the inner side riprap cofferdam body and the outer outside riprap cofferdam body is filled with clay to form a first-level clay cofferdam body, the inner side riprap cofferdam body, the outer side riprap cofferdam body and the first-level clay cofferdam body form an earth-rock cofferdam, and after the construction of the earth-rock cofferdam, a second-level clay cofferdam body is constructed above the earth-rock cofferdam through filling; and plastic concrete drilling occlusion piles are constructed in the middle part of the first-level clay cofferdam body as the anti-seepage system of the earth-rock cofferdam. According to the construction method, the cofferdam can be quickly reconstructed on the basis of the remaining sand-filled long pipe bags and the river bed remaining after the original primary cofferdam is destroyed by rush of river, the stable earth-rock cofferdam and the anti-seepage system thereof are formed, and remaining civil engineering in the cofferdam is guaranteed to reach the construction condition of no-water operation.

Description

technical field [0001] The invention relates to a construction method for rebuilding a cofferdam anti-seepage system in an immersed tube tunnel, and belongs to the technical field of water conservancy construction. Background technique [0002] The Honggu Tunnel crosses the Ganjiang River and connects the Honggutan New District and the old city on the east bank. It is 1.4km away from the upstream Nanchang Bridge and 2.3km away from the downstream Bayi Bridge. It is an east-west two-way six-lane urban traffic trunk line. The total length of the tunnel is 9.3km, and the section across the river uses immersed tubes with a length of 1329m. The tunnel adopts the design of "rapid river crossing, underwater interchange, multi-point evacuation, and east-west connection". The main line passes through Honggu Middle Avenue and Ganjiang Middle Avenue, crosses Ganjiang River and Jiangxinzhou in a straight line, connects the east bank with an underwater interchange, and sets up a pair of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D19/04E02D5/36
CPCE02D5/36E02D19/04
Inventor 文哲邓彪谢震灵董小龙郭小龙万超郭俊杨国胜万慕华徐多叶亮张荣华徐雪莹吴孔勇彭炎锋邳仲强崔海龙南飞燕
Owner 中铁隧道集团二处有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products