Concrete Steel Tube Column-Steel Beam External Diaphragm Joint Structure and Its Construction Method
A technology for concrete-filled steel tubular columns and concrete structures, which is applied to building components, building structures, earthquake-proof and other directions to achieve the effects of enhanced combined action, reasonable design, and reduced size
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] Such as figure 1 , figure 2 , image 3 , Figure 4 and Figure 5 The concrete-filled steel tube column-steel beam outer diaphragm joint structure shown includes a steel tube concrete column, a steel beam 4 located outside the steel tube concrete column, and a beam connected between the steel tube concrete column and the steel beam 4 The column connection structure, the steel pipe concrete column and the steel beam 4 are arranged vertically.
[0062] The concrete-filled steel pipe column includes a rectangular steel pipe column 2, four groups of longitudinal ribs 1 with openings arranged on the four inner walls of the rectangular steel pipe column 2, and a core concrete structure 3 filled in the rectangular steel pipe column 2. The perforated longitudinal ribs 1 are all poured in the core concrete structure 3, and the structure and size of all perforated longitudinal ribs 1 in the four groups of perforated longitudinal ribs 1 are the same; each group of perforated l...
Embodiment 2
[0104] In this example, if Figure 7 , Figure 8 , Figure 9 and Figure 10 As shown, the adopted CFST column-steel girder outer diaphragm node structure is different from that of Embodiment 1 in that: the web connecting plate 6 and the steel girder 4 are connected by welding, and the four The perforated longitudinal ribs 1 are respectively arranged in the middle of the four inner side walls of the rectangular steel pipe column 2 .
[0105] In this embodiment, the structure and connection relationship of the remaining parts of the steel pipe concrete column-steel beam outer diaphragm joint structure are the same as those in Embodiment 1.
[0106] In this embodiment, the construction method of the steel pipe concrete column-steel girder external diaphragm joint structure is different from that in Embodiment 1 in that: when connecting the steel girders in step 3, the steel girder 4 and the web connection plate 6 are connected by Connected by welding.
[0107] In this embodi...
Embodiment 3
[0109] In this example, if Figure 11 , Figure 12 , Figure 13 and Figure 14 As shown, the adopted CFST column-steel girder outer diaphragm node structure is different from that of Embodiment 1 in that it also includes m stirrups 9 arranged on the four groups of longitudinal ribs 1 with openings from top to bottom. , the stirrups 9 of the m road are arranged in parallel, and the stirrups 9 of the m road are arranged perpendicular to the rectangular steel pipe column 2, wherein m is a positive integer and m≥3; the stirrups 9 of the m road are all poured in the core Inside the concrete structure 3;
[0110] The number of through holes 10 opened on the strip steel ribs is m, and the stirrups 9 of the m roads are respectively from the m through holes 10 opened on each of the strip steel ribs. through. Such as Figure 15 As shown, the through hole 10 is a slot-shaped hole.
[0111] In this embodiment, m=5.
[0112] During actual construction, the value of m can be adjuste...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com