Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Calculation method for low permeability reservoir flooding information of fluid replacement

A calculation method and low-permeability technology, which are applied in the field of calculation of water-out information in low-permeability oil reservoirs, can solve problems such as difficulty in meeting production requirements, lack of calculation methods for water-out information in low-permeability oil reservoirs, and limited application range, and achieve good results. The effect of applying value

Active Publication Date: 2016-03-30
BC P INC CHINA NAT PETROLEUM CORP +1
View PDF4 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, there are many methods for evaluating the water flooding level of water flooded formations, such as qualitative identification method of well logging curves, intersection chart method and movable fluid analysis method, etc. All have regional limitations, and there is no general fast and qualitative calculation method for water flooding information of low-permeability reservoirs, which is difficult to popularize and apply
Reconstructing the resistivity of the original formation in the water-flooded zone is one of the effective methods to quickly and qualitatively divide the water-flooding level. However, due to the lack of data in this area, and the reconstruction methods are mostly established based on a large number of core experiment data, they are limited by expensive coring costs. Due to limitations and lack of core experimental analysis data, the scope of application is not large, especially in the secondary development of old oilfield areas, it is difficult to meet the actual production needs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Calculation method for low permeability reservoir flooding information of fluid replacement
  • Calculation method for low permeability reservoir flooding information of fluid replacement
  • Calculation method for low permeability reservoir flooding information of fluid replacement

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0044] According to the regional oil reservoir development background, through the comparative analysis of the logging response characteristics of the reservoirs in the study area before and after water flooding, the natural gamma and sonic time difference logging curves with no obvious changes in lithology and physical properties before and after water flooding are selected. According to the water cut demarcation boundary in the Standard for Logging Data Processing and Interpretation of Flooded Layers (SY / T6178-2011), combined with the oil test data, a representative model well (F w ≤10% is not flooded) logging information, the fuzzy clustering mathematical method is used to establish the functional relationship between the resistivity of the original fluid contained in the reservoir pores and the natural gamma and acoustic time difference, figure 1 is the model well resistivity R t The cumulative frequency distribution diagram of the sample set can be divided into 4 categori...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention discloses a calculation method for low permeability reservoir flooding information of fluid replacement. The method comprises: 1) acquiring response features of logging before and after reservoir flooding in a region, and selecting, from the response features, natural gamma GR and acoustic interval transit time AC logging curves without significant lithological and physical changes before and after flooding; 2) selecting logging information of a model well that is not flooded, and establishing a function relationship among electrical resistivity of an original fluid in reservoir pores, natural gamma and acoustic interval transit time; 3) calculating a flooded model well in the region by using the function relationship to obtain the electrical resistivity t1 of the original fluid contained in the reservoir pores in the flooded model well, and comparing the electrical resistivity t1 with electrical resistivity t2 obtained by actual measurement to obtain an electrical resistivity variation value; 4) establishing a dividing standard of identifying a flooding level by using the electrical resistivity variation value delta Rt; and 5) according to the dividing standard of identifying the flooding level by using the electrical resistivity variation value delta Rt, established in the step 4), accurately and effectively determining flooding information of a to-be-evaluated well in the region.

Description

technical field [0001] The invention belongs to the technical field of petroleum logging, and relates to a method for calculating water-out information of a fluid-replaced low-permeability oil reservoir. Background technique [0002] The target reservoir in the study area has poor physical properties and small storage space. The porosity distribution ranges from 4 to 16%, and the permeability is mainly distributed in the range of 0.1 to 2×10. -3 μm 2 It belongs to low porosity and low permeability reservoirs. After more than 20 years of water flooding development, the fluid properties, pore structure and oil-water distribution of the reservoir have changed. With the increase of water content, the flooding situation is complex, the electrical changes are getting bigger and bigger, and it is difficult to identify the flooding level. Accurate division of water flooding level is a problem that must be solved in the adjustment of waterflooding oilfields, and plays a vital role...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q50/02
CPCG06Q50/02Y02A10/40
Inventor 成志刚石玉江罗少成陈玉林李素娟张海涛郑小敏肖飞吴有彬唐冰娥
Owner BC P INC CHINA NAT PETROLEUM CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products