Shallowly buried small-spacing rock soil tunnel construction method

A technology of tunnel construction and small spacing, applied in tunnels, tunnel lining, earthwork drilling, etc., can solve the problems of surface subsidence, increased rescue costs and follow-up support costs, hidden safety hazards, etc., to improve the overall construction progress, high promotion Use value, improve the effect of construction safety

Active Publication Date: 2015-07-22
核工业井巷建设集团有限公司
View PDF6 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] With the continuous development of tunnel engineering technology, there are shallow buried and small spacing tunnels in the tunnels of highways, railways, rail transit, water conservancy, nuclear power and other projects. Difficulties, in the case of relatively poor geological conditions, if the thickness of the rock pillars between the old and new tunnels is not enough, when the tunnel is excavated, the surrounding rock plastic zone around the contour line is too large, or even runs through the rock pillars, which will lead to plastic failure of the structure ; In addition, after the excavation of the old and new tunnels, the rock pillars between the old and new tunnels will bear huge vertical pressure without lateral constraints. When the rock pillars are narrow in width, they can be regarded as slender Unconfined compression of components, when there is a bias, it is easy to lose stability and damage; small-spacing tunnels are prone to engineering accidents such as rock pillar damage between tunnels, tunnel blasting operations that are constructed later, and tunnels that are constructed earlier; There are engineering accidents such as roof fall, surface subsidence, and upper surrounding rock stepping into the air; the occurrence of the above-mentioned accidents brings great safety hazards to the construction, and also increases the rescue costs and follow-up support costs after the accident, which is not conducive to the protection of the surface environment. Not conducive to engineering construction safety

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0030] Embodiment: A construction method for shallow-buried rock-soil tunnels with small spacing, including

[0031] (1) Measure and set out, use the total station to stake out accurately, including stake out for large pipe sheds, stake out for small conduits in advance, stake out for each cycle of excavation contours, stake out for initial support and follow up concrete construction formwork measurement;

[0032] (2) Open excavation and support at the entrance of the cave: use manual cooperation with machinery to carry out open excavation, carry out slope brushing, and support the hole face formed by large pipe shed and steel arch frame to form an open cave, including the advance pre-preparation of the large pipe shed Reinforcement, and advanced small conduit construction;

[0033] The advance pre-reinforcement of the large pipe shed includes the advance pre-reinforcement of the parallel pipe shed and the advance pre-reinforcement of the excavation line pipe shed;

[0034] T...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a tunnel construction method, in particular to a shallowly buried small-spacing rock soil tunnel construction method. According to the technical scheme, the shallowly buried small-spacing rock soil tunnel construction method comprises the steps of 1, measuring and setting out; 2, open cutting and supporting at a tunnel portal section, wherein the step of open cutting and supporting at the tunnel portal section comprises the sub-steps that the open cutting is conducted by the cooperation of manpower and machinery, slope cutting is conducted, portal face supporting is formed by adopting a large pipe shed and a steel arch, therefore an open hole is formed, and the step comprises the sub-steps of advanced pre-reinforcement of the large pipe shed and advanced construction of small pipes; 3, shallowly buried small-spacing tunnel excavation; 4, reinforcing of tunnel vault and tunnel spacing rock; 5, monitoring and measuring; 6, secondary lining concrete construction. The shallowly buried small-spacing rock soil tunnel construction method is beneficial for safety construction and improving economical benefits.

Description

technical field [0001] The invention relates to a tunnel construction method, in particular to a shallow-buried rock-earth tunnel construction method with small spacing. Background technique [0002] Due to the impact of topography, or in order to reduce land acquisition and demolition, the shallow buried and small-spaced tunnel scheme can not only solve the terrain constraints, reduce the excavation and backfilling of earth and stone, and reduce the damage to the surrounding environment, Moreover, it can reduce the cost of land acquisition and demolition, and reduce the scope of impact of blasting. [0003] With the continuous development of tunnel engineering technology, there are shallow buried and small spacing tunnels in the tunnels of highways, railways, rail transit, water conservancy, nuclear power and other projects. Difficulties, in the case of relatively poor geological conditions, if the thickness of the rock pillars between the old and new tunnels is not enough...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/00
CPCE21D9/00E21D9/001E21D9/006E21D11/00E21D11/10
Inventor 吴小光韩福来张晓军汪术伟黄志华
Owner 核工业井巷建设集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products