Three-wire parallel small spacing large section tunnel group construction method
A construction method and small-spacing technology, applied in tunnels, tunnel linings, earth-moving drilling, etc., can solve problems such as rock column instability, affecting the smooth progress of construction, safety accidents, etc. The effect of digging through safely
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The construction method of the three-line parallel small-space large-section tunnel group includes the following steps:
[0022] 1) Advance geological forecast: Firstly carry out regional geological forecast to form a macroscopic judgment on the condition of the rock mass in the strata where the tunnel is located, then conduct a geological sketch to reasonably infer the surrounding rock within 5m, and with the advancement of the tunnel face, open the Excavate the structure and structure data of the rock mass to improve, and finally carry out drilling sampling and prediction to determine the lithology and structural characteristics of the rock mass;
[0023] 2) Advance pre-reinforcement of the main tunnel:
[0024] 2a) Pre-reinforcement of the large pipe shed at the tunnel entrance: the pre-reinforcement of the large pipe shed is carried out at the shallow buried section of the main tunnel entrance and exit, and the φ108×5mm hot-rolled seamless steel pipe is installed wi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com