Method for controlling power-switching stable operation of air-conditioner unit of dual-powered trolley bus
An air-conditioning unit and operation control technology, applied in the field of control, can solve problems such as the inability to guarantee the cruising range of the vehicle and the consumption of large battery power
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Such as figure 1 As shown, a control method for stable operation across power sources of a trolleybus air-conditioning unit with dual moving sources. A detection circuit for respectively detecting the first power source and the second power source and correspondingly forming the first power signal and the second power signal, a main logic control unit for receiving the first power signal and the second power signal and outputting a control signal, and An execution unit for receiving a control signal and performing an operation, the cross-power stable operation control method includes the following steps:
[0028] S1. The detection circuit continuously detects the power supply voltage of the line network and the battery power for n times, and when it is confirmed that the voltage is 阈值 , When the minimum power threshold 阈值, when the battery power ≤ the minimum power threshold, the main logic control unit outputs a forced shutdown high-level voltage signal and a forced en...
Embodiment 2
[0035] The rest are the same as in Embodiment 1, except that the main logic control unit is also electrically connected to a pedal switch for indicating the branching state of the high-voltage overhead line network, and the control method also includes the following steps:
[0036] S3. When the pedal switch is closed, the main logic control unit outputs a high-level voltage signal for forced unloading, and the air-conditioning unit will be forcibly unloaded; when the pedal switch is opened, the main logic control unit outputs a low-level voltage signal for forced unloading, and the air-conditioning unit restarts and returns S1.
[0037] When the power source trolleybus is running under the high-voltage overhead line network, when it is running to the branch line to change lanes, the driver will step on the pedal switch, the pedal switch is closed, and the main logic control unit outputs a high-level voltage signal for forced unloading. The air-conditioning unit will be forced ...
Embodiment 3
[0039] The rest is the same as that of Embodiment 1, except that the cross-power supply stable operation control method also includes the first step of the forced energy-saving control signal / forced shutdown control signal output by the main logic control unit when the air conditioner unit is turned on. An additional control logic, the first additional control logic includes the following steps:
[0040] S11. The frequency converter and the signal receiver read the forced energy-saving control signal and the forced shutdown control signal input by the main logic control unit;
[0041] S12. When the forced energy-saving control signal is a high-level voltage signal and the forced shutdown control signal is a low-level voltage signal, the air-conditioning unit enters the forced energy-saving operation state. If the original output frequency of the inverter is ≥f 阈值 , then the output frequency of the inverter is reduced to f 阈值 , otherwise, the inverter maintains the original ou...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com