Combined rainwater seepage well and construction method
A construction method and combined technology, applied in waterway systems, water supply devices, drainage structures, etc., can solve the problems of ineffective use of rainwater, lack of regulation and storage, and difficult construction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The rainwater infiltration well of the present invention is made up of vertical shaft 1, pipeline 2, well body 3, vertical shaft 1 is positioned at the bottom of well body 3, and pipeline 2 is connected with well body 3, see figure 1. The structure of the well body 3 is basically the same as that of ordinary inspection wells, the difference is that the bottom of the ordinary inspection well is closed, while the bottom of the well body 3 of this invention is hollow, and the bottom of the well body 3 is connected to the shaft 1, which is the combination of the two structures. combination. The shaft wall of the shaft 1 is composed of 1 foundation section 4 and 1-10 standard sections 6, which are cast-in-place concrete. The basic section 4 and the standard section 6 are circular cylinders with the same outer diameter, the height of one section is 800-1500 mm, the bottom wall thickness of the basic section 4 and the standard section 6 is 100-200 mm, and the bottom inner dia...
PUM
Property | Measurement | Unit |
---|---|---|
Depth | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com