Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A special slope geomembrane fixing structure and fixing method for landfill

A fixing method and slope soil technology, applied in the direction of basic structure engineering, excavation, protection devices, etc., can solve the problems of geomembrane leakage, special slope without a good fixing method, etc., to achieve reduced deformation, good durability, The effect of high anti-seepage safety

Active Publication Date: 2016-07-13
ZHEJIANG URBAN & RURAL PLANNING DESIGN INST
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] The first object of the present invention is to solve the problem that the geomembrane is easily leaked when bolted on the steep rocky high slope and the slope with local depressions, and to provide a kind of technology that is mature, convenient for construction, and high in safety. The special slope geomembrane fixed structure of the landfill site
[0010] The second purpose of the present invention is to solve the problem that the existing geomembrane and steep rocky high slopes and slopes with local depressions do not have a good fixing method, and to provide a method that is convenient for construction, safe in operation, and mature in technology. Special slope geomembrane fixation method for landfill

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A special slope geomembrane fixing structure and fixing method for landfill
  • A special slope geomembrane fixing structure and fixing method for landfill
  • A special slope geomembrane fixing structure and fixing method for landfill

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0042] exist figure 1 , image 3 In the shown embodiment, a special slope geomembrane fixing structure for a landfill includes a slope 1, a groundwater drainage layer and a protective layer under the membrane 2 and a basic geomembrane 3, a groundwater drainage layer and a protective layer under the membrane 2 is laid on the slope 1, and the basic geomembrane 3 is laid on the underground drainage layer and the protective layer under the membrane 2, and the basic geomembrane 3, the underground drainage layer and the protective layer 2 are nailed with the slope 1 As a whole, the nail 4 is covered with a low-foaming closed-cell foam board 5, and the top of the low-foaming closed-cell foam board 5 is covered with a double-smooth geomembrane 6, and the periphery of the double-smooth geomembrane 6 is connected with the nail nailed. Pressed base geomembrane 3 welded connections.

[0043] The nail 4 is a round steel member of U-shaped structure, including a nail foot 7 and a cross ba...

Embodiment 2

[0054] exist Figure 5 In the shown embodiment, a special slope geomembrane fixing structure for a landfill includes a pit 11, a groundwater drainage layer and a protective layer under the membrane 2 and a basic geomembrane 3, a groundwater drainage layer and a protective layer under the membrane 2 Lay on the side slope 1, the basic geomembrane 3 is laid on the underground drainage layer and the protective layer under the membrane 2, the basic geomembrane 3, the underground drainage layer and the protective layer 2 are nailed through the nails 4 and the pits 11 Set as a whole, set a low-foaming closed-cell foam board with a groove 12 set on the nail 4 whose size matches the width of the nail 4, and use the nail 4 to connect the basic geomembrane 3 and the groundwater drainage layer And the protective layer 2 under the film is nailed on the pit 11 together; a low-foaming closed-cell foam board 5 is arranged on the top of the nail 4, and the top of the low-foaming closed-cell fo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a landfill special slope geomembrane fixing structure and method. The structure comprises a slope, an underground water guide and draining layer, an under-membrane protecting layer and a base geomembrane, wherein the underground water guide and draining layer and the under-membrane protecting layer are laid on the slope, the base geomembrane is laid on the underground water guide and draining layer and the under-membrane protecting layer, the base geomembrane, the underground water guide and draining layer and the under-membrane protecting layer are integrated with the slope through clasp nails, the upper cover of each clasp nail is provided with a low-foaming closed-cell foam board, a double-polished-face geomembrane covers on the low-foaming closed-cell foam board, and the periphery of the double-polished-face geomembrane is welded with the base geomembrane. By the landfill special slope geomembrane fixing structure and method which is mature in technology, convenient in construction and high in safety, the problem that leakage occurs easily when bolts are used to fix the geomembrane on a steep rock slope and on a slope with partial recesses.

Description

technical field [0001] The invention relates to the technical field of environmental protection engineering, in particular to a geomembrane fixing structure for a special slope of a landfill and a fixing method thereof. Background technique [0002] Harmless landfill is currently one of the main ways to deal with domestic garbage, tailings and other solid and liquid waste that pollute the environment in the world. In order to prevent pollutants from polluting the surrounding environment, the more common method is to landfill Geomembrane is used on the bottom, side slope and top of the area to isolate pollutants from the surrounding environment. The laying and anchoring practices of geomembrane at the bottom of the reservoir, conventional slopes, and closures have been clearly defined. However, for how to fix the geomembrane to the steep rock slope and the slope with local depressions, how to fit the geomembrane to the sunken slope And other special fixing methods are not sp...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D31/00
CPCE02D17/20E02D31/02E02D31/04E02D2450/106
Inventor 俞楷郎庆善
Owner ZHEJIANG URBAN & RURAL PLANNING DESIGN INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products