A co-construction and sharing integrated integrated base station
An integrated, base station technology, applied in the field of communication towers, can solve the problems that communication towers cannot meet the requirements of co-construction and shared base station construction, etc., and achieve the effect of strong appearance integrity, strong three-dimensional sense of space, and high space utilization rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] A co-construction and sharing integrated integrated base station includes a tower body group, the tower body group includes two tower bodies 1, and the bottom of the tower body 1 is connected with a prefabricated foundation 6. At least one set of first connecting rods 7 perpendicular to the tower body 1 is fixedly arranged at the upper end of each tower body 1, and the outer ends of the first connecting rods 7 are jointly connected with the pole holding frame 2, which is a closed rectangular frame structure. The outside of the holding pole fixing frame 2 is fixedly provided with a circle of sky support holding poles 3 . Three cabinet placement platforms 4 are fixedly arranged between the lower ends of the tower body 1 to meet the needs of the three operators of China Mobile, China Unicom and China Telecom. The cabinet placement platform 4 is a rectangular structure, and a cabinet 5 is fixedly arranged on each cabinet placement platform 4 . In order to improve the stabi...
Embodiment 2
[0022] A co-construction and sharing integrated integrated base station includes a tower body group, the tower body group includes three tower bodies 1, and the bottom of the tower body 1 is connected with a prefabricated foundation 6. At least one set of first connecting rods 7 perpendicular to the tower body 1 is fixedly arranged on the upper end of each tower body 1, and the outer ends of the first connecting rods 7 are jointly connected with the pole fixing frame 2, which is a closed equilateral triangle frame structure , the outside of the holding pole fixing frame 2 is fixedly provided with a circle of sky support holding pole 3. Three cabinet placement platforms 4 are fixedly arranged between the lower ends of the tower body 1 to meet the needs of the three operators of China Mobile, China Unicom and China Telecom. The cabinet placement platform 4 is an equilateral triangle structure, and a cabinet 5 is fixedly arranged on each cabinet placement platform 4 . In order t...
Embodiment 3
[0024] A co-construction and sharing integrated integrated base station includes a tower body group, the tower body group includes four tower bodies 1, and the bottom of the tower bodies 1 is connected with a prefabricated foundation 6. At least one set of first connecting rods 7 vertical to the tower body 1 is fixedly arranged on the upper end of each tower body 1, and the outer ends of the first connecting rods 7 are jointly connected with the pole holding frame 2, which is a closed square frame structure. The outside of the holding pole fixing frame 2 is fixedly provided with a circle of sky support holding poles 3 . Three cabinet placement platforms 4 are fixedly arranged between the lower ends of the tower body 1 to meet the needs of the three operators of China Mobile, China Unicom and China Telecom. The cabinet placement platform 4 is a square structure, and a cabinet 5 is fixedly arranged on each cabinet placement platform 4 . In order to improve the stability of the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com