Embodiment 1
[0019] In 2012, in Xiaolongkou Village, Dayou Town, Jimsar County, the soil slope of the dam was 5m high, the test slope was 36m long, and the ground slope was 30°-35°;
[0020] a. Slope cleaning: remove weeds, floating soil, residues, compact holes, cut and fill slopes, and level the slopes;
[0021] b. Slope reinforcement: Excavate a diamond-shaped foundation groove on the slope with a prefabricated 0.8m concrete beam as the side length. The cross-sectional size of the concrete beam is 7cm×15cm, buried in the foundation groove 10cm, and exposed to the ground by 3cm. The concrete beams are connected to form a diamond Grid beam 1 structure, top beam 3 and bottom beam 4 are placed on the upper and lower ends of concrete grid beam 1, vertical beams 5 are placed every 10m between top beam 3 and bottom beam 4, and the bottom end of concrete grid beam 1 is opened Water interception ditch 2 at the foot of the slope;
[0022] c. Soil extraction: Take out part of the soil in the grid...
Embodiment 2
[0026] In 2013, in the 83-kilometer mileage section of Huangqiba in Karamay West Main Canal, the slope was 6m high, 100m long, and 30°-35°;
[0027] a. Slope cleaning: remove weeds, floating soil, caves and residues on the slope, fill and compact the slope to make the slope smooth;
[0028] b. Slope reinforcement: Excavate a diamond-shaped foundation groove on the slope with a prefabricated 1.0m concrete beam as the side length. The cross-sectional size of the concrete beam is 7cm×15cm, buried in the foundation groove 11cm, and exposed to the ground by 4cm. The concrete beams are connected to form a diamond shape Grid beam 1 structure, top beam 3 and bottom beam 4 are placed on the upper and lower ends of concrete grid beam 1, vertical beams 5 are placed every 13m between top beam 3 and bottom beam 4, and the bottom end of concrete grid beam 1 is opened Water interception ditch 2 at the foot of the slope;
[0029] c. Soil extraction: take out part of the soil in the grid of g...
Embodiment 3
[0033] In 2013, in Xiaoguai Village, Xiaoguai Township, Karamay, the slope of the water delivery channel was 3m high, the test slope was 50m long, and the ground slope was 30°-35°;
[0034] a. Slope cleaning: remove weeds, floating soil, residues, compact holes, cut and fill slopes, and level the slopes;
[0035] b. Slope reinforcement: Excavate a diamond-shaped foundation groove on the slope with a prefabricated 1.2m concrete beam as the side length. The cross-sectional size of the concrete beam is 7cm×15cm, buried in the foundation groove 12cm, and 5cm above the ground. The concrete beams are connected to form a diamond shape Grid beam structure, top beam 3 and bottom beam 4 are placed on the upper and lower ends of concrete grid beam 1, vertical beams 5 are placed every 15m between top beam 3 and bottom beam 4, and the bottom end of concrete grid beam 1 is sloped Foot cut-off ditch 2;
[0036] c. Take soil: Take out part of the soil in the grid of the concrete grid beam 1,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com