Construction method of self-seepage road
A construction method and road technology, applied in the direction of roads, roads, road bottom, etc., can solve the problems of surface layer water seeping into the ground, road surface damage, increase maintenance costs, etc., to reduce the degree of water seepage, road surface water Less water seepage and better effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0016] A construction method for a self-seepage highway. The method includes four steps. The first step is to treat the base soil layer first, and pre-embed a conical seepage cement pipe in the base soil layer, and pre-embed a conical seepage cement pipe per square meter -2, the depth of the conical seepage cement pipe buried in the foundation soil layer is 350-450mm, and the conical water seepage cement pipe buried in the foundation soil layer has a tapered water seepage opening set obliquely downwards, the second step foundation The conical seepage cement pipe with the soil layer upward is connected to the rebar, and the rebar is evenly distributed 4-8 around the circumference of the conical seepage cement pipe, and the concrete is poured. The third step is to lay a 400-800 mesh filter on the top of the seepage cement pipe, and filter The diameter of the net is 200mm larger than the diameter of the upper opening of the conical seepage cement pipe. The fourth step is to lay th...
Embodiment 2
[0020] In the construction method of the self-seepage highway described in embodiment 1, the first step in the first step is to first dig a pit, place the bottom of the conical seepage cement pipe into the pit, and then lay the foundation soil layer with a thickness of 150-200mm compaction, and then lay a cushion layer with a thickness of 150-200mm for compaction. The cushion layer is a mixture of stones and soil, the ratio is 1:2, and the particle size of the stones is 18-20mm.
Embodiment 3
[0022] The construction method of the self-seepage highway described in embodiment 1, the second step of pouring concrete is first pouring concrete around the conical seepage cement pipe, the edge of the concrete is slope-shaped, and is compacted with a vibrating rod. Then lay concrete in a large area, so that the concrete around the conical seepage cement pipe is integrated with the concrete poured afterwards, and then vibrate and compact with a vibrator again, and the concrete thickness is 300-400mm.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com