Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A method for establishing online monitoring data model of large power grid substation equipment

A technology of monitoring data and power transformation equipment, which is applied in the direction of power network operating system integration, electrical components, circuit devices, etc., can solve the problems of single/multi-level monitoring master station data usage and model maintenance difficulties, and achieve unified management and Source maintenance, small application impact, and enhanced versatility

Active Publication Date: 2016-12-07
ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to propose a method for establishing an online monitoring data model of large power grid substation equipment. The present invention effectively solves the problem of difficult data usage and model maintenance of the single / multi-level monitoring master station after the monitoring data goes out of the station, and reduces the monitoring data application. and the difficulty of data model maintenance, realize the source end maintenance of the data model, and at the same time facilitate the display of the model data in the monitoring master station, ensure the unified management of the monitoring data model from the substation to the monitoring master station at all levels, and make up for the existing IEC61850 standard in the substation data model Post-outbound application and management gaps

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for establishing online monitoring data model of large power grid substation equipment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0014] The flow chart of the online monitoring data modeling method for large power grid substation equipment of the present invention is as follows figure 1 shown, including the following steps:

[0015] The method for establishing an on-line monitoring data model of large power grid substation equipment proposed by the present invention includes the following steps:

[0016] 1) Modify the substation system model describing the relationship between the on-line monitoring device in the substation and the main wiring of the primary equipment:

[0017] 2) The monitoring master stations at all levels receive the system models of each substation, and analyze the substation code and coordinate information in the substation system model;

[0018] 3) Match the single substation system model with the corresponding substation information in the primary wiring diagram of the regional power grid according to the substation code and coordinate information;

[0019] 4) Link the substatio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an on-line monitoring data modeling method of bulk grid transformer equipment. The method comprises the following steps of 1) modifying substation system models, 2) allowing all-level main monitoring stations to receive the substation system models and analyzing a substation code and coordinate information in each substation system model, 3) matching the single substation system model with corresponding substation information in a primary wiring diagram of a regional grid according to the substation code and the coordinate information, 4) linking the substation system models with corresponding substation points in the primary wiring diagram of the regional grid, forming a provincial-level model file and forming version numbers, 5) forming and sending new substation system model version numbers to the all-level main monitoring stations after the substation system models are modified, and achieving automatic update of a network-level model by Step 2)-Step 4), and 6) splicing provincial-level on-line monitoring system models into a network-level on-line monitoring system model. The method is easy to realize, can reduce the update time of the model, and can raise an application level of the on-line monitoring model.

Description

technical field [0001] The invention relates to a method for establishing an online monitoring data model of a large power grid substation equipment, in particular to an IEC61850-based method for modeling the online monitoring data of a large power grid substation equipment, belonging to the technical field of online monitoring data communication of the substation equipment. Background technique [0002] With the expansion of the power system, it is not only necessary to use the overall operation information of the power system, but also to monitor the status of a large number of power equipment. A large amount of information requires fast and accurate integration and transmission in various automation systems. How to integrate and manage this information has become a big problem. [0003] The IEC6850 standard has been highly valued at home and abroad, and a large number of researchers have conducted long-term research on it. The online monitoring data modeling in the subs...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J13/00
CPCY02B70/30Y02E60/00Y04S10/16Y04S20/242
Inventor 任宏达陈晓国刘磊郝爽廖新征王俊锞丁泽俊李昊刘旭
Owner ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products