Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

System and method for extra-high-voltage steel tube tower simulating training

A simulation training system, steel pipe tower technology, applied in the processing and construction simulation training system, UHV steel pipe tower design field, can solve the problems of personal casualties, equipment loss, lack of understanding of trainees, etc., to improve understanding and mastery, Strong programming productivity, convenient and efficient unified effect

Inactive Publication Date: 2014-10-08
STATE GRID CORP OF CHINA +1
View PDF4 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

High training time and cost
[0004] 2) The overall effect throughout the design, processing and construction process is not comprehensive, the training visualization details are not enough, the trainees do not understand deeply, and the training efficiency is not high
[0005] 3) Most of the traditional methods are centralized training and assessment, and the trainees cannot independently arrange the training time, training content and training frequency, with low degree of freedom and lack of interaction
[0006] 4) Due to the limitations of equipment, venue, time, etc., there are few opportunities for on-site training, and the training cannot meet the needs of trainees for on-site drills on important operations such as design, processing, and construction.
Under the constraints of objective conditions, trainees need to wait for on-site training opportunities, and the overall technical level and actual operation level of personnel cannot be improved
[0007] 5) In some actual on-site training, due to operational failure, misoperation and other reasons, equipment loss, personal injury and other accidents may be caused, and the risk of potential safety hazards is high
[0008] 6) The design, processing, and construction of steel pipe towers have not formed a serialized, standardized, and streamlined training mechanism, and the training content has no continuity, and the training and assessment have not formed a unified whole
But so far, there is no domestic simulation training system specially developed for the technical training needs in the design, processing and construction of UHV steel pipe towers in the construction of transmission lines. , cannot fully restore the real landscape from a high degree of vision, and the simulation system does not provide modules and functions for interactive simulation drills and tests for UHV steel pipe tower processing and construction simulation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • System and method for extra-high-voltage steel tube tower simulating training
  • System and method for extra-high-voltage steel tube tower simulating training
  • System and method for extra-high-voltage steel tube tower simulating training

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] Below in conjunction with accompanying drawing and embodiment the present invention will be further described:

[0049] The invention relates to a virtual reality technology simulation training system for the design, processing and construction of UHV steel pipe towers, such as figure 1 As shown, including: data layer, central processing unit, application layer and distributed operation terminal;

[0050] The data layer includes: a simulation database for providing 3D models of various equipment for UHV steel pipe tower simulation and related data information, as well as a test question database and a simulation operation database for trainee assessment;

[0051] The 3D models of various equipment used for UHV steel pipe tower simulation include: steel pipe towers, poles, tools, and high-precision 3D models of machines and tools, with color, texture, specification attribute information, etc.

[0052] The application layer includes:

[0053] Design module: used to simu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a system and method for extra-high-voltage steel tube tower simulating training. The system comprises a data layer, a central processing unit, an application layer and multiple distributed operating terminals, wherein the data layer, the central processing unit, the application layer and the distributed operating terminals are sequentially connected. The data layer comprises a simulation database, a test question database and a simulation operation database, wherein the simulation database is used for providing three-dimensional models and relevant data information of various devices for extra-high-voltage steel tube tower simulation and the test question database and the simulation operation database are used for student examinations. The application layer comprises a design module, a machining module, a construction module, a test question examination module and a simulation examination module. The system and method have the advantages that three-dimensional display and virtual simulation visual display of invisible parts and steel tube tower engineering application key technology in the processes of design, machining and construction of an extra-high-voltage steel tube tower are achieved, imagination and visualization training is achieved, trainees can more deeply understand and master the theory, and training time is shortened.

Description

technical field [0001] The invention relates to power grid technical skills training, in particular to a simulation training system and method for the design, processing and construction of a UHV steel pipe tower. Background technique [0002] With the westward shift of my country's energy strategy, the characteristics of UHV long-distance, large-capacity, and low-loss power transmission have become the first choice for long-distance power transmission. The development of UHV power transmission technology has been included in the twelfth five-year plan for national economic and social development. In the erection of UHV power transmission and transformation, most of the large-load towers start to use steel pipe towers. The steel pipe tower design, processing technology and quality have a very important influence on the service stability of the tower. At the same time, the heavy weight of the steel pipe tower, the large base of the tower, and the height of the tower require ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F9/455G06F17/50G06Q50/20
Inventor 方建筠宋云京唐燕玲王德州李洪涛
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products