Construction method for shear wall concrete formworks and pillar concrete formworks

A technology of concrete formwork and construction method, applied in formwork/formwork/work frame, processing of building materials, preparation of building components on site, etc., can solve problems such as low construction efficiency, improve construction efficiency and wide adjustment range , the effect of simple operation

Inactive Publication Date: 2014-09-03
FUYUAN FUJIAN ENVIRONMENTAL PROTECTION TEMPLATE
View PDF7 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the concrete formwork is only a square or square formwork. Although the formwork can be made in the factory, it still needs a lot of assembly at the construction site. The construction efficiency is low, and there is still room for further improvement.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for shear wall concrete formworks and pillar concrete formworks
  • Construction method for shear wall concrete formworks and pillar concrete formworks
  • Construction method for shear wall concrete formworks and pillar concrete formworks

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0072] The construction method of the shear wall concrete formwork provided by the present embodiment comprises the following steps:

[0073] S1: Stitching templates, such as figure 1 As shown, the standardized concrete formwork 1 is spliced ​​into a pre-designed shear wall formwork 100. The concrete formwork 1 can be a concrete formwork in the prior art, but it needs to be ensured that one side is a smooth surface, which is compatible with the concrete when pouring concrete grout. The slurry contacts and forms the surface of the condensed building component, and the other surface needs to be provided with quick-connect grooves or similar structures so that various fixtures can be installed. The concrete formwork 1 used in this embodiment is a Chinese utility model patent ZL201220200056. 8 disclosed concrete formwork, its structure is as figure 2 As shown, the size can be set according to actual needs. The shear wall formwork 100 is closed, and its closed interior forms a c...

Embodiment 2

[0089] The difference between this embodiment and Embodiment 1 is that in step S3, the gap in the horizontal direction between the concrete forms 1 on the same plane is also adjusted, and the adjustment method includes the following steps:

[0090] a. In step S3, after installing the horizontal fixed pipe 5, ensure that the horizontal fixed pipe 5 can move along its length direction under a predetermined force. The specific installation method is to lock the horizontal fixed pipe 5 on the concrete with the screw 6 On the formwork 1, properly control the locking force of the screw 6 so that it will not lock the horizontal fixing pipe 6 and the concrete formwork 1 too tightly. Move, the installation hole that is used for locking screw 6 on the horizontal fixed pipe 5 needs to be slightly larger than the outer diameter of screw 6, preferably be designed as the waist-shaped hole that the longitudinal direction is consistent with the horizontal fixed pipe 5 lengthwise. In addition,...

Embodiment 3

[0097] The difference between this embodiment and Embodiment 1 is that the concrete formwork 1 used in this embodiment is further improved on the basis of the concrete formwork disclosed in Chinese utility model patent ZL201220200056.8, which is disclosed in Chinese utility model patent ZL201220200056. In 8, the splicing surface of the concrete formwork 1 and its smooth surface are perpendicular to each other, that is, there is an angle of 90° between them. It is not convenient to disassemble after pouring concrete, and a large disassembly force is required. In this embodiment, the angle between the joint surface of the concrete formwork 1 and its smooth surface is changed from 90° to 45°. Those skilled in the art can also according to the size of actual dismantling force, only the fixture design of the part splicing surface of concrete formwork 1 and its smooth surface is 45 °, and other splicing surfaces are still 90 ° of included angles.

[0098] When using the concrete for...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction method of shear wall concrete formworks, and the method is higher is using efficiency. The method includes the steps that the formworks are spliced, spacing is fixed, transverse reinforcing is performed, longitudinal reinforcing is performed, integral hoisting is performed, a shear wall is poured, and the formworks are disassembled, wherein the standard concrete formworks are used for being spliced, and the splicing efficiency is high; meanwhile, because the standard concrete formworks can be reused, the using efficiency is higher, and the spliced shear wall formworks can be reused in construction of shear walls of all floors. The invention further provides a construction method of pillar concrete formworks, and the construction method of the pillar concrete formworks is similar to the construction method of the shear wall concrete formworks. Due to the adoption of the method, the shear wall concrete formworks and pillars can be spliced and prefabricated in a factory instead of on a construction site, operation space of the construction site is not occupied, the shear wall concrete formworks can be directly installed and used after being hoisted to the construction site, secondary splicing is not needed, and the construction efficiency on the construction site is improved.

Description

technical field [0001] The invention relates to a construction method of a concrete building component, in particular to a construction method of a concrete formwork for a shear wall and a concrete formwork for a column. Background technique [0002] A large number of formwork is used in the process of prefabricating concrete components. Because different shapes of buildings use different concrete formwork, most of the formwork cannot be reused, resulting in great waste; for this purpose, standardized formwork units are used, and the formwork units can be repeated. Use and can be spliced ​​into concrete formwork of various shapes. [0003] Chinese invention patent ZL93103864.2 discloses a cement concrete formwork and its pouring construction method. The standard formwork formed by plastic or metal is connected to each other to form building components of different shapes, such as models of columns, beams, walls, ceilings, etc. For pouring cement concrete slurry, the formwor...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/02E04G11/12E04G13/02
Inventor 许金锔吴清瑶
Owner FUYUAN FUJIAN ENVIRONMENTAL PROTECTION TEMPLATE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products