Underground construction advanced detection method and system based on resistivity of multiple same source electrode arrays
An underground engineering and electrode array technology, which is applied in radio wave measurement systems, electric/magnetic exploration, geophysical measurement, etc., can solve the problems of sensitive response, interference, and low resolution, and increase the detection distance and sensitivity Improve, improve the effect of spatial resolution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Taking a certain tunnel as an example, the section of the tunnel is arched, the span is 12m and the height is 8m. There is water gushing near the mileage ZK97+853, and there may be a water-bearing structure in front. The resistivity method of the homogeneous source electrode array is used for advanced detection. The specific working method is as follows: figure 2 Shown:
[0043] (1) Arrange 3 parallel measuring lines L on the tunnel face 1 , L 2 and L 3 , respectively arranged at heights of 3m, 6m and 9m from the bottom plate, the number of measuring electrodes M on each measuring line is 13, forming an array measuring electrode system;
[0044] (2) Arrange 4 power supply electrodes A evenly on the periphery of the array measuring electrode system along the contour line of the tunnel face, and then arrange 4 measuring lines on the side wall starting from these 4 power supply electrodes A, each measuring line The number of power supply electrodes A on the top is 5,...
Embodiment 2
[0051] Taking a certain tunnel as an example, the section of the tunnel is arched, the span is 12m, and the height is 8m. Water gushes near the mileage ZK97+853. Repeat the test steps (1) to (5). The 3D imaging results of this detection are as follows: Figure 4 As shown, the surrounding rocks in the ZK97+871~ZK97+875 section are relatively rich in water.
Embodiment 3
[0053] Taking a certain tunnel as an example, the section of the tunnel is arched, the span is 12m, and the height is 8m. Water gushes near the mileage ZK97+853. Repeat the test steps (1) to (5). The 3D imaging results of this detection are as follows: Figure 5 As shown, the surrounding rocks in the ZK97+874~ZK97+875 section are relatively rich in water.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com