Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for calculating power grid operation evaluation index dimensionless

A dimensionless technology for power grid operation, applied in computing, instruments, data processing applications, etc., can solve the problems of inability to effectively guide power system operation evaluation, lack of differentiation and longitudinal comparability of indicators, and difficulty in carefully considering the characteristics of indicator differentiation, etc. problems, to achieve the effect of enhancing objectivity and comparability, less development difficulty, and strong practicability

Active Publication Date: 2013-12-04
CHINA SOUTHERN POWER GRID COMPANY +1
View PDF8 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The dimensionless index score calculated by the above method is difficult to carefully consider the differential characteristics of different intervals of the index, and it is difficult to highlight the actual impact of the index on the operation level of the power grid in different intervals in actual use, and cannot effectively guide the evaluation of power system operation
[0004] At the same time, the above method lacks the statistical analysis of the historical data of the indicators, and linear fitting is performed by manually setting the characteristic values ​​of the indicators, which lacks the necessary support and is not reliable. Comparability leads to poor practicality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for calculating power grid operation evaluation index dimensionless
  • Method for calculating power grid operation evaluation index dimensionless
  • Method for calculating power grid operation evaluation index dimensionless

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0020] The flow chart of the multi-interval dimensionless calculation method of the power grid operation index based on the numerical historical distribution probability of the present invention is as follows: figure 1 As shown, the method of the present invention realizes the dimensionless transformation of the grid operation index. The method implementation process of the present invention comprises as follows:

[0021] (1) Input the current data of the index from the real-time database of the power grid, and input the historical data of the index from the historical database of the power grid to form the information database calculated by this method;

[0022] Input the basic data of grid operation indicators required for this calculation process. The required input data includes both the current data of grid operation indicators and the historical data of indicators. The current data of the indicator is input from the real-time database of the grid, while the historical d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention relates to a method for calculating the power grid operation evaluation index dimensionless. The method comprises the following steps of 1) inputting the current data of an index from a power grid real-time database and inputting the historical data of the index from a power grid historical database to form an information database; 2) setting the interval number of the index and the index threshold values corresponding to the upper and lower limits of each interval; 3) analyzing the historical data of the index and counting the number of the historical data of the index within different intervals; 4) positioning the position of the current data of the index in a histogram by a historical distribution histogram of the index and the current data value of the index, and separately calculating the out-interval ranking rate and the in-interval ranking rate of the index to obtain the current ranking rate of the index; 5) setting the index scores corresponding to the upper and lower limit threshold values of the different intervals of the index, considering the distinction of a maximum index and a minimum index, and calculating the offset amount of the current ranking of the index. The calculation method of the present invention is simple in flow, small in computation amount and development difficulty and strong in practicality, and the definition of an intermediate result during the calculation process is clear.

Description

technical field [0001] The present invention is a dimensionless calculation method of power grid operation evaluation index, especially a multi-interval dimensionless calculation method of power grid operation index based on numerical historical distribution probability, which belongs to the innovation of the dimensionless calculation method of power grid operation evaluation index technology. Background technique [0002] Power grid operation evaluation indicators play an important role in grasping the operating status of the power grid, analyzing the advantages and disadvantages of dispatching business work, and improving the level of dispatching business. However, since the power grid operation evaluation index is often an evaluation of a certain aspect of the power grid operation, it often has different physical dimensions. The difference in physical dimensions and assessment objects of power grid operation evaluation indicators makes it difficult to achieve horizontal ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/06
Inventor 郑耀东汪皓冯永青陈启鑫赵翔宇赖晓文张海吴俊范展滔辛阔
Owner CHINA SOUTHERN POWER GRID COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products