Arch dam-arch shoulder grooving method in mountain narrow canyon
A technology of narrow valleys and spandrels, applied in excavation, construction, infrastructure engineering, etc., can solve the problems of destroying the ecological environment, wasting land resources, and high construction risks, achieving high risk, reducing ecological environment damage, and direct economic Obvious effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] Include the following steps:
[0016] (1) Construct a traffic tunnel that can reach the head of the dam. Through the tunnel to reach the head of the dam, the dam site area is a narrow "V"-shaped river valley. The slope is about 60°~90°;
[0017] (2) For excavation, the excavation steps shall not exceed 5m at the excavation site near the dam crest. After two steps, the excavation steps may be increased to 10m. The opening lines of adjacent steps are parallel to ensure that the drilling In the same plane, blasting parameters:
[0018] 5m ladder section, the main blasting hole is drilled by medium wind pressure down-the-hole drilling, the hole diameter is 90mm, the hole distance of the main blasting hole is 2.5m, the row spacing is 2.0m, the hole depth is 5.0m, the charge length is 2.5m, continuous charge, the main blasting hole The plugging length is 2.5m, the detonating cord and non-electric millisecond detonating detonator are used in the detonating network, and the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com