Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Prestressed pipe pile construction method under boulder group geological conditions

A technology of prestressed pipe piles and geological conditions, which is applied in the direction of sheet pile walls, foundation structure engineering, buildings, etc., to achieve the effects of improving bearing capacity, increasing horizontal load capacity, and increasing frictional resistance around piles

Inactive Publication Date: 2013-09-11
二十二冶集团天津建设有限公司
View PDF5 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The present invention aims to solve the above-mentioned problems existing in the construction of pipe piles under the geological conditions of existing boulder groups, and provides a method for fast hole formation, saving construction costs, ensuring the bearing capacity of pipe piles, and preventing pile heads from being displaced due to horizontal forces. Construction method of prestressed pipe piles under the geological conditions of isolated boulder groups

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prestressed pipe pile construction method under boulder group geological conditions
  • Prestressed pipe pile construction method under boulder group geological conditions
  • Prestressed pipe pile construction method under boulder group geological conditions

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The present invention will be further described below in conjunction with the accompanying drawings and embodiments, and the purpose is only to better understand the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.

[0018] see figure 1 , the prestressed pipe pile construction method under the geological conditions of the boulder group described in the embodiment of the present invention is carried out according to the following steps:

[0019] ⑴Pile position measurement and positioning:

[0020] Based on the coordinate measurement control point set by the owner in the field area as the benchmark, the center pile of each group of piles and the piles of any pile coaxial with the center pile are released one by one through coordinate conversion, rotation angle, distance measurement, and fixed point by using the range finder. The other pile positions of each group of piles are released one by one ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Login to View More

Abstract

The invention relates to a pipe pile construction method, in particular to a prestressed pipe pile construction method under boulder group geological conditions. According to the method, a down-the-hole hammer drilling process is adopted for guide hole construction; during pile sinking construction, first cement mortar is poured in a pile hole, and then a static pile driver is utilized to press a pipe pile into the pile hole; during pile head fixing construction, a #-shaped fixing frame formed by connecting fasteners is utilized to fix a pile head through a steel pipe at the position of an orifice of the pile hole, a splayed steel pipe is adopted to support two ends of the #-shaped fixing frame, the lower end of the steel pipe is embedded in a soil layer; and after the cement mortar is hardened and is integrated with surrounding rock stratums and the pipe pile, prestressed pipe pile construction is finished. According to the prestressed pipe pile construction method, a hole forming speed is quick, a construction period is short, and construction cost can be reduced by over 10%; by adopting a mode of pouring the cement mortar in the guide hole, pipe pile side pressure, end bearing capacity and the position of the pile side can be guaranteed, and side-direction stress safety of the pipe pile can be guaranteed; a pile head fixing head is simple, construction is convenient, verticality of the pipe pile is guaranteed, and bearing capacity of the prestressed pipe pile is also effectively improved.

Description

technical field [0001] The invention relates to a construction method for pipe piles, in particular to a construction method for prestressed pipe piles under the geological conditions of boulder groups. Background technique [0002] At present, the pilot holes in pipe pile construction generally use equipment such as rotary drilling rigs, impact hammers, reverse circulation drilling rigs, full casing and full rotary drilling rigs, etc. These equipments have problems of fast wear of drilling tools, easy fracture of drill pipes, and serious mud pollution to varying degrees. , construction quality is not guaranteed, etc., and for the lead holes under the geological conditions of the boulder group, the above-mentioned equipment has the problem of slow hole forming speed or even difficulty in completing the lead holes; in the pile sinking and pile fixing construction, due to the diameter of the lead hole It is larger than the diameter of the pipe pile, and the depth of the pilot ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D5/58E02D5/30
Inventor 黄修振曲建华姚东森朱文革王滨
Owner 二十二冶集团天津建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products