Maintenance method for air leakage from pipeline of hot-air system of blast furnace
A hot blast system and pipeline technology, applied in blast furnaces, blast furnace details, blast furnace parts and other directions, can solve problems such as taking a long time and affecting blast furnace production process production, shortening the time for shutdown and maintenance, and ensuring construction safety and construction. Efficiency, the effect of reducing economic losses
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] On May 6, 2006, Xinxing Casting Pipe Co., Ltd. Wu'an Industrial Zone No. 1 Ironmaking 1#460m 3 The top of the blast furnace hot air surrounding pipe suddenly ran out of wind, and a 0.4m crack appeared in the pipe shell. According to the method of the present invention, the repair was carried out. The construction equipment used: 1 powerful mixer, 1 set of vibrating rods, 1 set of electric welding tools, 1 set of gas welding tools, 1 set of grouting equipment, 1 1.5m crowbar;
[0024] Construction materials: δ=2mm steel plate, 1.2mm diameter iron wire 20m, pipe shell and other thickness shell steel plate 1m 2 1m of machine-made fiberboard with a thickness of 20mm 2 , Non-aqueous press-feed material 1 ton.
[0025] The specific operation steps are as follows:
[0026] 1. Shut down the blast furnace in an emergency, and close all the hot blast valves; the thickness of the pipe shell 1 is 10mm, open the pipe shell 1 at the place where the wind runs, and the arc surface a...
Embodiment 2
[0036] On August 17, 2007, Xinxing Casting Pipe Co., Ltd.’s No. 2 Ironmaking 2# Blast Furnace and 2# Hot Blast Stove’s three-fork position has been operating for many years. The position of the 2# Hot Blast Stove’s three-fork position has run out of air, and the middle of 1# and 2# Hot Blast Stoves There is a phenomenon that the pipe is burning red. Open the air running position and the red tube position and found that there are about 500mm*500mm square collapsed bricks in the running wind position, and the refractory brick at the top of the red tube position sinks about 100mm as a whole. From this, it can be inferred that the top liner of the pipeline about 10m long from the 2# hot blast stove to the vertical pipe has been damaged and needs to be overhauled.
[0037] Carry out emergency repair according to the method of the present invention, used construction equipment: 1 powerful mixer, 1 set of vibrating rods, 1 set of electric welding tools, 1 set of gas welding tools, 1 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com